U.S. construction contractors in 2026 — market, licensing and bonding, tariffs on building materials, contract revenue, sales tax and labor, and tax for general contractors, subcontractors and remodelers
Licensing comes first: North Carolina requires a general contractor license for projects of $40,000 or more, California requires a CSLB license for jobs of $1,000 or more, and New York leaves licensing to New York City and the counties. On the tax side, contractors have to get contract revenue recognition, sales tax on materials, worker classification and equipment depreciation right. Imported building materials also carry Section 232 duties and antidumping orders.
- $2.164 trillion
- U.S. construction spending in 2025, down 1.4% from 2024; $1.6496 trillion in the first nine months of 2026, down 2.9% year over year (Census, released November 2, 2026)
- $40,000 / $1,000
- North Carolina requires a general contractor license for any single project of $40,000 or more; California requires a CSLB license once labor and materials reach $1,000, or whenever a permit is required or employees are used
- $32,000,000
- The 2026 §448(c) threshold: if average gross receipts for the prior three years don't exceed it and the contract is expected to finish within two years, you can skip the percentage-of-completion method; residential contracts are exempt at any size
- 100% / 85%
- Equipment acquired after January 19, 2025 qualifies for 100% federal bonus depreciation; North Carolina adds back 85% and deducts it over five years, and California and New York don't conform
At a glance
- Market: U.S. construction spending was $2.164 trillion in 2025, with private work down 2.9% and public work up 3.6%. The September 2026 annual rate was $2.186 trillion: residential is falling while nonresidential and public work hold up. Construction employment was 8.37 million (October 2026, preliminary).
- Licensing: North Carolina requires an NCLBGC license from $40,000 (limited up to $750,000 per project, intermediate up to $1.5 million, unlimited). California requires a CSLB license from $1,000, a $25,000 license bond, and a $100,000 worker bond for LLCs. New York has no statewide license; NYC requires a DCWP home improvement license and DOB registration for major work, and Long Island, Westchester and other counties license home improvement contractors.
- Revenue recognition: long-term contracts generally use the §460 percentage-of-completion method. Contracts expected to finish within two years by contractors with average receipts of $32 million or less (2026) are excepted, and the 2025 law widened the home construction exception to all residential contracts, apartments included. Retainage timing needs its own look.
- Sales tax on materials: all three states treat a contractor doing a capital improvement as the consumer of materials: it pays tax when it buys them and doesn't charge the owner. Repairs differ: North Carolina and New York tax them, California treats contractors as retailers of fixtures, and lumber carries a 1% assessment there.
- Labor and equipment: the 1099-NEC threshold is $2,000 for payments from 2026. California's AB5 and New York's Fair Play Act presume construction workers are employees, and public work requires prevailing wages and certified payroll. Equipment gets 100% federal bonus depreciation and a 2026 §179 limit of $2.56 million, but NC, CA and NY all need separate state depreciation.
How big is the U.S. construction market, and is it growing or shrinking in 2026?
It's huge, and it has softened a little in 2025–2026. According to the Census Bureau, U.S. construction spending was $2.164 trillion in 2025, 1.4% less than in 2024, with private work down 2.9% and public work up 3.6%. Spending in the first nine months of 2026 was $1.6496 trillion, 2.9% below the same period of 2025. Residential is weighed down by interest rates while public work and parts of nonresidential hold up.
The industry has three layers. General contractors (GCs) take the whole project from the owner and hand pieces to specialty subcontractors (electrical, plumbing, HVAC, steel, roofing, finishes and so on), who in turn use smaller subs and individual tradespeople. Alongside them are residential remodelers, commercial tenant-improvement firms, and importers and distributors of building materials. Chinese- and Korean-owned construction businesses in the U.S. are mostly residential remodelers, small GCs and specialty subs, plus engineering firms that come over to build plants for their parent companies.
Description: annual and monthly U.S. construction spending, the private/public split and construction employment, from the Census Bureau and the Bureau of Labor Statistics (BLS).
| Measure | Number | Source and date |
|---|---|---|
| 2025 construction spending | $2.164 trillion ($2,164.4 billion), down 1.4% from 2024 | Census, Construction Spending (released February 2026; annual figures may be revised) |
| Private / public | $1.6475 trillion, down 2.9% / $516.8 billion, up 3.6% | Same |
| 2025 residential | $905.2 billion, down 2.6% | Same |
| September 2026 (annual rate) | $2.186 trillion; private residential $848.8 billion, private nonresidential $790.6 billion, public $546.8 billion | Census (released November 2, 2026) |
| First nine months of 2026 | $1.6496 trillion, down 2.9% from the same period of 2025 | Same |
| Construction employment | 8.37 million; average hourly earnings $42.03 | BLS, October 2026 (preliminary) |
- Residential: mortgage rates have made both new homes and remodeling weaker than in 2024. Developers and GCs building single-family homes, townhomes and apartments feel rates most.
- Nonresidential: factories, data centers, hospitals and warehouses have been the main sources of work in recent years. For data center construction see yclcpa.com/datacenter, and for factory projects see yclcpa.com/factory.
- Public work: roads, schools and water systems run on federal and state money. Public work brings prevailing wages, certified payroll and bonding, each covered below.
- Where North Carolina fits: North Carolina's population is growing fast, Raleigh-Durham and Charlotte have plenty of residential and commercial projects, and new battery, semiconductor and pharmaceutical plants have added industrial work for GCs and specialty subs.
Who regulates construction contractors, and what licenses and permits do you need?
Contractor licensing is mostly a state and local matter: state licensing boards issue general and specialty licenses, and cities and counties issue building permits and inspect the work. At the federal level, OSHA covers safety, EPA covers lead-based paint, and federal projects bring Davis-Bacon prevailing wages and Miller Act bonds. Doing licensed work without a license can mean you can't collect, plus fines, and in California possible criminal charges.
- Federal safety: OSHA's construction standards (29 CFR 1926) cover fall protection, scaffolds, excavation, silica and more. Accidents and citations affect your insurance costs and your ability to bid.
- Lead-based paint (RRP): firms renovating, repairing or painting homes or child-occupied facilities built before 1978 need lead-safe certification from EPA (or an authorized state), with a certified renovator on site. North Carolina runs this program through its state health department.
- Federal projects: federal construction contracts over $2,000 must pay local prevailing wages under the Davis-Bacon Act, with weekly certified payroll (WH-347). Larger federal projects need performance and payment bonds under the Miller Act, and states and localities have similar bonding laws for public work.
- State licenses: general and specialty licenses (electrical, plumbing, HVAC and so on) come from state boards, and North Carolina, California and New York differ a lot. The next section compares them.
- Local: building permits, zoning, inspections and certificates of occupancy come from cities and counties, and some also require a business license or business tax registration. New York City adds site safety training (SST) and more.
- Contracts and consumer protection: states have specific rules for home improvement contracts, deposits and cancellation rights; California, for example, requires home improvement contracts to explain how to cancel. Have an attorney review your contract terms.
License applications, contracts and job site disputes are handled by attorneys and licensing boards; YCL handles the tax, bookkeeping and payroll side.
How do North Carolina, California and New York differ on licensing, taxes and labor rules?
North Carolina licenses by project size: $40,000 and up needs a general contractor license, and electrical, plumbing and HVAC work needs a specialty license at any amount. California is the strictest: a CSLB license is required from $1,000, with bond and workers' comp requirements. New York State has no general contractor license; New York City and counties such as Nassau, Suffolk and Westchester license home improvement contractors. The three states also differ on sales tax, worker classification, retainage and state income tax.
| Item | North Carolina | California | New York |
|---|---|---|---|
| General contractor license | NCLBGC: required for any single project of $40,000 or more; limited up to $750,000 per project, intermediate up to $1.5 million, unlimited with no cap (excluding land costs) | CSLB: required when labor and materials reach $1,000, or a permit is required, or employees are used; A (engineering), B (general building), C (specialty) classifications | No statewide license; NYC requires a DCWP home improvement license ($20,000 bond or trust fund) and DOB registration for GCs on new buildings and major alterations; Nassau, Suffolk, Westchester and other counties license home improvement contractors |
| Specialty licenses | Electrical (NCBEEC) and plumbing, heating and fire sprinkler (state board) licenses at any amount | C-10 electrical, C-36 plumbing, C-20 HVAC and others, all under CSLB | NYC licenses electricians and plumbers; elsewhere it's local |
| Bonds and insurance | Workers' comp required with 3 or more employees; a GC is liable for a sub's workers if the sub has no proof of coverage | $25,000 license bond; LLCs also need a $100,000 worker bond and liability insurance; workers' comp required for every licensee from January 1, 2028 | Workers' comp, disability (DBL) and paid family leave; the Scaffold Law makes liability insurance expensive |
| Sales tax on materials | Capital improvements: the contractor pays tax on materials and doesn't tax the contract price (SUTB 72-3); repair, maintenance and installation (RMI) services are taxable | Materials: the contractor is the consumer and pays tax; fixtures: the contractor is the retailer (Reg. 1521); a 1% lumber assessment applies | Capital improvements: the contractor pays tax on materials, the owner gives an ST-124 and the contract isn't taxed; repairs and maintenance are taxable services |
| Prevailing wage | No state prevailing wage law; federally funded projects still fall under Davis-Bacon | Public works over $1,000 pay prevailing wages; bidders register with DIR ($400 a year) and file certified payroll electronically | Public work under Labor Law §220; some privately owned projects with public funding are also covered |
| Employee or sub | Federal and general NC standards; NC accepts misclassification complaints and enforces | AB5's ABC test; construction subs must meet §2781 (CSLB license and more), and an unlicensed sub's workers are your employees | The Construction Industry Fair Play Act presumes workers are employees; willful misclassification costs up to $2,500 per worker, $5,000 for a repeat |
| Retainage cap | Public projects of $150,000 or more only, up to 5% per payment, and no further retainage after 50% completion | Private contracts signed from January 1, 2026: 5% | Private contracts over $150,000: 5%; since December 2025, provisions above the cap are void |
| Corporate income / franchise tax | 2% corporate income tax (2026) plus franchise tax (minimum $200) | 8.84% corporate tax, $800 minimum; LLCs also pay an LLC fee based on gross receipts | State corporate tax generally 6.5% (7.25% above $5 million of business income); NYC corporate tax generally 8.85%, unincorporated business tax (UBT) 4% |
| Bonus depreciation | Add back 85%, deduct 20% a year over the next five years | Doesn't conform; §179 limit $25,000 | Doesn't conform (with narrow exceptions); recompute with regular depreciation |
| Minimum wage (2026) | Federal $7.25 | $16.90 | $17.00 in NYC, Long Island and Westchester; $16.00 elsewhere |
- North Carolina: the license threshold is measured by the total cost of a single project, so splitting one job into several contracts to stay under $40,000 doesn't work. The limited and intermediate caps above follow the current text of G.S. 87-10; older materials that cite $500,000 and $1 million are out of date. Employers with 25 or more employees must use E-Verify. For sales tax registration and the E-500 see yclcpa.com/salestax, and for payroll taxes see yclcpa.com/payroll.
- California: a low threshold and strict enforcement. Under SB 779, the minimum civil penalty for unlicensed activity rose to $1,500 from July 1, 2026. Under AB5, a construction sub counts as a sub only if it meets every §2781 condition, including a CSLB license, its own business location and a local business license; hire an unlicensed "sub" and the law treats its workers as your employees. SB 1455 moved the date when every contractor must carry workers' comp from 2026 to January 1, 2028.
- New York: Labor Law §240(1), the "Scaffold Law," makes owners and contractors absolutely liable for gravity-related injuries such as falls, which is the main reason liability insurance costs so much in New York. Large NYC projects often use owner- or contractor-controlled insurance programs (OCIP / CCIP). NYC businesses also deal with state tax, city corporate tax or UBT, and the Metropolitan Commuter Transportation Mobility Tax (MCTMT).
- Other states: Texas and Florida have no state personal income tax and license many trades at the city or county level. Before taking a job in another state, check its licensing, foreign qualification and payroll tax rules (see yclcpa.com/llc).
Bonds and insurance: what does a contractor need?
Most owners and all public projects ask for performance and payment bonds, and the surety sets your bonding line from your financial statements, work-in-progress schedule and credit. Insurance starts with general liability, workers' comp and commercial auto. How good your financial statements are directly limits how big a job you can take.
- License bonds: California requires a $25,000 CSLB license bond, plus a $100,000 bond for workers' wages if the license is held by an LLC. NYC's home improvement license needs a $20,000 bond or enrollment in the trust fund. North Carolina requires evidence of financial responsibility set by the board.
- Contract bonds: a performance bond guarantees you finish, and a payment bond guarantees you pay subs and suppliers. Sureties often want CPA-prepared financial statements and a WIP schedule showing each job's contract amount, estimated cost, cost to date, overbillings and underbillings. See yclcpa.com/financials.
- General liability and umbrella: New York is the most expensive because of the Scaffold Law. California LLC licensees must carry liability insurance (sized by the number of people on the license, starting at $1 million).
- Workers' comp: North Carolina requires it with three or more employees, California as soon as you have an employee (C-39 roofers regardless), and New York as soon as you have an employee, plus disability and paid family leave.
- On the books: amortize bond premiums and insurance over the policy period. Workers' comp premiums are audited at year-end, and that audit is often where 1099 subs who are really employees turn up.
What duties apply to imported building materials in 2026?
As of November 2026, building materials are among the most complicated categories for duties. Steel, aluminum, copper and their derivatives pay Section 232 duties of 25% or 50% on full value. Softwood lumber pays 10% under Section 232, and Canadian lumber also carries AD/CVD. Cabinets and vanities pay 25% under Section 232, rising to 50% on January 1, 2027. Chinese quartz countertops, ceramic tile, plywood and aluminum extrusions carry antidumping orders, and most other Chinese building products pay 25% under Section 301 plus 12.5% since July 24, 2026. Have your customs broker confirm by HTS code against the latest notices.
Description: for each material, the HTS heading, the duties and AD/CVD orders that stack on the main origins. Actual rates depend on the exact code, origin and exporter; confirm with your customs broker and the latest CBP and Commerce notices.
| Material | HTS (heading) | Chinese origin | Other origins | Watch for |
|---|---|---|---|---|
| Rebar, structural steel, pipe, nails | 7213–7217, 7306, 7317 and others | Section 232 at 50% (full value) + Section 301; many steel products also carry AD/CVD | Section 232 at 50% (15% for some goods from deal partners) | Section 232 goods don't get the 12.5% |
| Aluminum extrusions, window frames | 7604, 7608, 7610 and others | Section 232 at 50% or 25% + Section 301; AD/CVD orders on aluminum extrusions | Section 232 | Finished goods with 15% or less metal by weight are outside 232 |
| Copper pipe, wire | 7411, 8544 and others | Section 232 (copper) + Section 301 | Section 232 | Confirm by code whether it's a copper derivative |
| Softwood lumber (framing) | 4407.1x | Section 232 at 10% + Section 301 | Section 232 at 10%; Canada also has AD/CVD, "all others" combined 24.72% (amended November 19, 2026) | Canada is the largest source |
| Kitchen cabinets, vanities | Parts of 9403.40, 9403.60 | Section 232 at 25% + Section 301 at 25% + AD/CVD | Section 232 at 25% | Section 232 rises to 50% on January 1, 2027 |
| Hardwood plywood | 4412 | Section 301 + 12.5% + AD/CVD (2018 orders) | Indonesia and Vietnam: final determinations in 2026, ITC injury vote in September 2026 | Transshipment through third countries gets clawed back |
| Quartz countertops | 6810.99 | Section 301 + 12.5% + AD/CVD (2019 orders) | India and Turkey have orders (2020) | Rates vary widely by exporter |
| Ceramic tile | 6907 | Section 301 + 12.5% + AD/CVD (2020 orders, continued after the 2026 sunset review) | Normal duty | Rates by exporter |
| Lighting, hardware, sanitary ware, flooring and more | 9405, 8302, 6910, 3918 and others | Mostly Section 301 at 25% + 12.5%; metal content may bring in 232 | Normal duty; Korean goods mostly duty-free under KORUS | Check code by code |
Section 232: steel, aluminum, copper and wood
- Steel, aluminum and copper: since April 6, 2026 the duty is charged on the full value of the goods: 50% for goods made essentially of these metals, 25% for derivatives that use a lot of them, and 15% for certain equipment through the end of 2027. Goods whose metal content is 15% or less by weight aren't covered. Some codes changed again from June 8, 2026. See our insight article on the 2026 full-value change and yclcpa.com/steel.
- Timber and wood products: since October 14, 2025, softwood lumber pays 10%, kitchen cabinets, vanities and their wood parts 25%, and upholstered wooden seating 25%. The planned increase for cabinets and vanities was pushed to January 1, 2027 (to 50%). For cabinet imports see yclcpa.com/cabinet.
Section 301, the 12.5% layer and antidumping orders
- Section 301 on China: since 2018 most building-product codes have been on List 3 (25%), with a few on List 4A (7.5%). The forced-labor Section 301 action adds 12.5% on goods from mainland China and Hong Kong from July 24, 2026, but not on Section 232 goods.
- AD/CVD: building materials carry more AD/CVD orders than almost any other category. You post cash deposits at the published rate on entry, and annual reviews set the final duty later, which can mean a bill or a refund. CBP can claw back duties evaded through third-country transshipment or minor processing under EAPA.
- IEEPA and de minimis: the 2025 IEEPA duties were struck down by the Supreme Court on February 20, 2026, and importers of record can request refunds through CBP's CAPE. The $800 de minimis exemption is suspended for every country and is repealed by law from July 1, 2027. Building materials mostly move in full containers, so this mainly affects samples and parts. For booking refunds, see the tariff section of yclcpa.com/amazon.
Who imports, and how costs flow
- If you import yourself: a contractor that buys cabinets, stone or lighting overseas is the importer of record (IOR). You need a customs bond and broker, and country-of-origin marking, Lacey Act declarations for wood products and TSCA formaldehyde certification for composite wood are your responsibility.
- Duties are job costs: duties, AD/CVD deposits, freight and brokerage go into material cost and then into job cost. Under percentage of completion, they also affect the completion percentage.
- Contract price escalation: on a fixed-price contract, the contractor usually absorbs a tariff increase. Write material escalation and tariff clauses into the contract before you sign, and have an attorney review them.
How does sales tax on construction materials work in North Carolina, California and New York?
All three states treat a contractor doing a capital improvement for an owner (new construction, alterations, renovations that become part of the building) as the final consumer of the materials: it pays sales tax when it buys them and doesn't charge tax on the contract price. The difference is repairs and maintenance: North Carolina and New York tax repair and maintenance of real property as a service, while California treats contractors as retailers of fixtures and adds a 1% lumber assessment.
North Carolina
- Capital improvements: under NCDOR's SUTB 72-3, receipts from real property contracts aren't subject to sales tax, and the contractor pays tax to its supplier when it buys materials. Materials bought tax-free out of state need use tax paid directly. Don't show "sales tax" on an owner's invoice; tax stated separately on a real property contract is treated as collected in error and has to be remitted.
- E-589CI: when the owner or GC gives an Affidavit of Capital Improvement (E-589CI), the job is treated as a real property contract.
- Repair, maintenance and installation (RMI): repair, maintenance and installation services that aren't capital improvements are taxable, so the contractor registers for sales tax and files the E-500. Split mixed jobs by contract and scope.
- Resale: when you sell materials to another contractor for resale, take an E-595E resale certificate.
California
- Materials and fixtures are different: under CDTFA Regulation 1521, a contractor is the consumer of materials (lumber, cement, rebar, piping and other items that become part of the structure) and pays tax when buying them, but the retailer of fixtures (lighting, HVAC units, plumbing fixtures and the like). Tax on fixtures is usually measured by cost, and fixtures bought out of state or tax-free require a seller's permit and self-reporting.
- Lumber assessment: buyers of lumber and engineered wood products for use in California pay a 1% Lumber Products Assessment, usually collected by the retailer along with sales tax. If the seller doesn't collect it, as with out-of-state purchases, you report it to CDTFA yourself.
- Local rates: the statewide base rate is 7.25% plus district taxes, and the rate follows where the materials are used.
New York
- Capital improvements: the contractor pays tax on materials, the owner gives an ST-124 (Certificate of Capital Improvement), and the contractor doesn't collect tax from the owner. If a proper certificate doesn't arrive within 90 days, the contractor has to prove the job was a capital improvement or collect tax on the full contract. Tax paid on materials isn't refunded.
- Repairs and maintenance are taxable services: repairs, maintenance and installation that aren't capital improvements are taxed at 4% state plus local tax (8.875% combined in NYC). Contractors can buy materials that become part of the repaired property tax-free with an ST-120.1 and collect tax from the customer.
- Registration: contractors who perform taxable repairs need a New York sales tax Certificate of Authority.
Selling building materials and marketplaces
Distributors and retailers that only sell materials, lighting or hardware follow the normal retail rules. Remote sellers register once they pass state thresholds (North Carolina: more than $100,000 a year; California: $500,000; New York: $500,000 and more than 100 sales), and marketplaces such as Amazon and Home Depot's online marketplace collect for you. For home improvement retail channels see yclcpa.com/homedepot and yclcpa.com/lowes.
How do contractors recognize revenue? Percentage of completion, completed contract and retainage
For tax, long-term construction contracts generally use the §460 percentage-of-completion method (PCM): you recognize revenue in proportion to costs incurred over estimated total costs, regardless of billings or collections. Two exceptions allow the completed-contract method (CCM) or other methods: residential construction contracts (including apartments and condos since the 2025 law), and other contracts expected to finish within two years by contractors whose average gross receipts for the prior three years don't exceed $32 million (2026).
Description: compares the percentage-of-completion method, completed-contract method, accrual billing and the cash method: who can use each, when revenue is recognized and what to watch.
| Method | Who can use it | When revenue is recognized | Watch for |
|---|---|---|---|
| Percentage of completion (PCM) | Default for all long-term contracts | Each year, by costs incurred over estimated total costs | Look-back calculation after completion (Form 8697), with interest on over- or underpaid tax |
| Completed contract (CCM) | Residential contracts; or contracts by contractors with average receipts of $32 million or less expected to finish within two years | All at once in the year the job is completed | Costs are deferred too; big multi-year jobs can bunch income into one year |
| Accrual / billings | Contracts that qualify for the small contractor exception | As billed and earned | Retainage is generally income when the right to it becomes fixed |
| Cash method | Companies with average receipts of $32 million or less (not tax shelters) | When received | Year-end collections and payments shift income between years |
Do you qualify for the small contractor exception?
- Two tests: in the year you sign the contract, your three-year average gross receipts under §448(c) don't exceed the threshold ($31 million for 2025, $32 million for 2026), and you expect when signing to finish within two years. Contracts that meet both can skip PCM. Related companies' receipts are combined.
- Residential contracts: contracts where 80% or more of estimated costs go to dwelling units and related on-site improvements. Before the 2025 law only "home construction contracts" (buildings with four or fewer units) were exempt. P.L. 119-21 §70430 extends the exemption to all residential construction contracts entered into in tax years beginning after July 4, 2025, so apartment and condo developers and GCs can use CCM too. Large contractors that don't meet the small contractor tests still capitalize costs under §263A. Rev. Proc. 2026-32 provides automatic accounting method change procedures.
- Method changes: switching methods generally requires Form 3115, and the small contractor exception applies on a cut-off basis to new contracts only. Model several years of tax before you switch.
Retainage
- What it is: the owner holds back part of each progress payment (often 5%–10%) until the job is finished and accepted, and the GC does the same to its subs. North Carolina public projects cap it at 5%, and California and New York private contracts are now capped at 5% (see the table above).
- When it's taxable: under PCM, revenue follows costs, so retainage doesn't change the timing. Under the accrual method or CCM, the IRS position is that retainage is generally income when the right to it becomes fixed, usually on acceptance. On the cash method, it's income when received.
- On the books: keep retainage receivable and retainage payable in separate accounts, tracked by job, and reconcile them with owner and sub statements at year-end.
Bookkeeping and financial statements
- Job costing: track materials, labor, subs, equipment and overhead by job; it's the only way to compute percentage complete and build a WIP schedule.
- Book-tax differences: GAAP financial statements (ASC 606) generally recognize revenue over time as you perform, while for tax you may use CCM or the cash method. Keep a reconciliation between the two.
- Overbillings and underbillings: billing ahead of progress is a liability, billing behind is an asset, and sureties and banks look hard at both.
How do contractors depreciate equipment and vehicles after the 2025 law?
The 2025 law made 100% bonus depreciation permanent for property acquired after January 19, 2025, and the 2026 §179 limit is $2.56 million, phasing out above $4.09 million. Excavators, loaders and tools are generally 5-year property and can be fully deducted in the year placed in service. But North Carolina adds back 85%, and California and New York don't conform, so you need separate state depreciation schedules.
- Asset classes: construction machinery and tools are generally 5-year MACRS property (asset class 15.0), light trucks are 5-year, office furniture 7-year, and warehouses and offices 39-year.
- 100% bonus depreciation: qualified property acquired and placed in service after January 19, 2025 can be expensed in full. You can elect out and depreciate normally if you'd rather save deductions for higher-income years.
- §179: the 2026 limit is $2,560,000, reduced once §179 property placed in service exceeds $4,090,000, with a $32,000 cap for SUVs. §179 can't create a loss; the excess carries forward.
- Vehicles: passenger vehicles under 6,000 pounds have annual depreciation caps. Heavy trucks are regular equipment, and highway vehicles of 55,000 pounds or more owe the federal heavy highway vehicle use tax (Form 2290).
- State tax: North Carolina adds back 85% of federal bonus depreciation and deducts 20% of the add-back in each of the next five years, with a $25,000 §179 limit. California doesn't allow bonus depreciation and limits §179 to $25,000. New York generally doesn't conform to bonus depreciation for property placed in service since 2003 and recomputes with regular MACRS.
- Trade-ins and sales: gain on selling bonus-depreciated equipment is ordinary income under §1245 to the extent of depreciation taken, and equipment trade-ins no longer qualify for 1031 exchanges (real property only).
Workers, subs and payroll: employee or 1099, and how does prevailing wage work?
Construction is where worker misclassification enforcement is toughest. Workers who follow your schedule, use your tools and take direction from your foreman are generally employees and belong on payroll and workers' comp. Truly independent, licensed subs with their own businesses fill out a W-9 and get a 1099-NEC, and from 2026 only once you pay them $2,000 in a year. California's AB5 and New York's Fair Play Act both presume construction workers are employees. Public work adds prevailing wages and certified payroll.
- Federal tests: the IRS looks at behavioral control, financial control and the relationship; the Department of Labor uses an "economic reality" test. Misclassification means back payroll taxes, penalties and interest, and possibly back overtime.
- California: AB5's ABC test applies. A construction sub counts as a sub only if it meets Labor Code §2781 (a written subcontract, a CSLB license, its own business location and business license, and more). When you pay an individual sub $600 or more, you also report it to the EDD on a DE 542 within 20 days.
- New York: the Construction Industry Fair Play Act (Labor Law Article 25-B) presumes construction workers are employees unless they pass a three-part test or qualify as a "separate business entity" under 12 criteria. Willful misclassification costs up to $2,500 per worker, up to $5,000 for a repeat within five years, and can be a crime, and job sites must post the notice.
- North Carolina: there's no construction-specific presumption, but workers' comp has a "statutory employer" rule: if a sub has no proof of coverage, the GC is liable for the sub's workers. Collect a certificate of insurance (COI) from every sub and keep them for the premium audit.
- 1099-NEC: from 2026, if you pay an unincorporated sub $2,000 or more, file a 1099-NEC by January 31 of the following year (the threshold is indexed for inflation from 2027). Without a W-9, backup withhold at 24%. See yclcpa.com/1099nec.
- Prevailing wage and certified payroll: federal projects use weekly WH-347s under Davis-Bacon. California public works over $1,000 pay prevailing wages, and projects above the small project exemption ($25,000 for new construction, alteration, installation, demolition or repair; $15,000 for maintenance) require DIR registration and electronic certified payroll. New York uses Labor Law §220. Prevailing wages include fringe benefits, which payroll has to show separately.
- Payroll taxes: in North Carolina that's federal 941 and 940, state withholding (NC-5), unemployment (NCUI 101), and W-2s and the NC-3 at year-end (see yclcpa.com/payroll). Union jobs add benefit fund contributions under the collective agreement.
What taxes apply when a foreign company builds in the U.S.?
Chinese and Korean engineering companies building plants in the U.S. for a parent or customer most often overlook three things. A long-running job site can create a U.S. permanent establishment (PE), meaning a 1120-F, or a U.S. subsidiary filing a 1120. Wages for work done in the U.S. by seconded employees are U.S.-source income. And service and technical fees paid to foreign subs or the parent may need 30% withholding. Foreign-owned U.S. companies also file 5472 and BE-13 as usual.
- Permanent establishment: under tax treaties, a building site or installation project becomes a PE only after it lasts a set time; under the U.S.-China treaty it's more than six months, and other treaties differ. Profits attributable to a PE are taxed in the U.S., which is why many companies contract through a U.S. subsidiary that files a 1120. State taxes ignore treaties, so a job site and employees in a state usually mean state filings.
- Seconded employees: wages for days worked in the U.S. are U.S.-source income. Whether they owe U.S. income tax depends on the treaty and days present, and the employer generally has U.S. payroll withholding duties. The U.S. and Korea have a totalization agreement, so seconded Korean employees with a certificate of coverage can be exempt from U.S. Social Security and Medicare taxes; the U.S. and China have no such agreement. Whether a visa category (B-1, L-1, E-2 and others) allows job site work is for immigration counsel, and the question got more attention after a September 2025 immigration enforcement action at a battery plant construction site in Georgia.
- Payments abroad: fees a U.S. company pays a foreign sub for services performed in the U.S. are U.S.-source income, so collect a W-8BEN-E and withhold 30% or the treaty rate, then file 1042 and 1042-S by March 15 of the following year. Design work done entirely outside the U.S. generally isn't U.S.-source. See yclcpa.com/w8ben.
- 5472 and BE-13: U.S. companies 25% or more foreign-owned file Form 5472 with the 1120 every year, with a $25,000 initial penalty per missed form (see yclcpa.com/5472). A foreign person acquiring 10% or more of the voting interest files BE-13 within 45 days; since October 3, 2025, investments of $40 million or less file the exemption claim (see yclcpa.com/be13).
- Transfer pricing: technical staff, design and management services and management fees from the parent to the U.S. subsidiary must be priced at arm's length under §482, with contracts and calculations kept on file.
Example: a North Carolina GC and a 2026 commercial upfit
Example (hypothetical numbers, to show the method): a Raleigh GC (an S corporation with a North Carolina intermediate license and $6 million of average gross receipts over the prior three years) signs a commercial interior upfit in August 2026 for a fixed price of $1,200,000, with estimated total cost of $1,000,000 and expected completion in May 2027. By December 31, 2026 it has incurred $450,000 of costs and billed $600,000; the owner held 5% retainage of $30,000, so $570,000 was collected. The company also bought a $180,000 excavator in 2026.
| Item | Amount | Notes |
|---|---|---|
| License | Intermediate is enough | $1,200,000 is within $1.5 million; larger jobs need an unlimited license |
| Must it use PCM? | No | $6 million average receipts is under $32 million and the job should finish within two years, so the small contractor exception applies |
| Option A: PCM revenue for 2026 | $540,000 | $1,200,000 × 45% ($450,000 ÷ $1,000,000) |
| Option A: 2026 gross profit | $90,000 | $540,000 − $450,000 |
| Option B: CCM revenue for 2026 | $0 | Revenue and costs are deferred to completion in 2027, with about $200,000 of gross profit then |
| Retainage of $30,000 | Already inside the $540,000 under Option A | Under the accrual method without CCM, generally income on acceptance |
| Federal depreciation on the excavator | $180,000 | 100% bonus depreciation in 2026 |
| North Carolina add-back | $153,000 | $180,000 × 85%; deducted at $30,600 a year in 2027–2031 |
| Sales tax on materials | About $21,750, paid at purchase | $300,000 of materials × 7.25% (Wake County); part of job cost, not charged to the owner |
| 1099-NEC for subs | $150,000 to the electrical sub | File by January 31, 2027 (next business day if it's a weekend); collect a W-9 and COI first |
Total profit is the same under both methods; the difference is which year it's taxed. Option B pushes 2026 profit into 2027, but if other big jobs also finish in 2027, income bunches into one year. S corporation profit is taxed to the owners at individual rates and has to be planned together with reasonable owner salaries (see yclcpa.com/scorp). Which method to use and when to switch depend on your job schedule and rates over the next few years; results depend on the actual facts and on the IRS.
What does the timeline look like from forming the company to the first job?
First settle the state, the entity and who holds the license (who sits for the exam and serves as qualifier). Then form the company and get licenses, bonds and insurance. Before the first job, set up sales tax, payroll, workers' comp and job-cost bookkeeping. At year-end, file under the revenue method you chose and get 1099-NECs and W-2s out by the end of January.
Description: from choosing the state and entity to the annual filings after the first job, with who does each step.
| When | What to do | Who |
|---|---|---|
| Month 0 | Choose the state and entity (LLC, S corporation, C corporation); decide the license qualifier; for foreign owners, review 5472, BE-13 and PE exposure | YCL (tax), attorneys |
| Month 1 | Form the company, registered agent, EIN, bank account; BE-13 within 45 days of a foreign investment | YCL |
| Months 1–3 | State contractor license exams and applications (NC NCLBGC, CA CSLB, NYC DCWP / DOB or county licenses); license bond | Qualifier, attorneys |
| Months 2–3 | General liability, workers' comp, commercial auto; open a bonding line with a surety and prepare financial statements | Insurance broker, surety, YCL (statements) |
| Before work starts | Sales tax registration (NC RMI, NY repair services), resale and exemption certificates; payroll tax accounts; W-9s and COIs from subs | YCL |
| During construction | Job costing and the WIP schedule; weekly certified payroll on public work | YCL |
| Quarterly | 941, state withholding and unemployment; estimated taxes; NC E-500 and other sales tax returns | YCL |
| January 31 | W-2s and 1099-NECs (subs paid $2,000 or more); NC-3 | YCL |
| March 15 / April 15 | S corporation and partnership / C corporation returns; 1042-S for payments to foreign persons; 5472 | YCL |
Key rules at a glance
| Item | Who / form | Number / rule | Notes | Year |
|---|---|---|---|---|
| NC general contractor license | NCLBGC · G.S. 87-1, 87-10 | $40,000 | License required at or above; limited up to $750,000 per project, intermediate $1.5 million, unlimited no cap | Current |
| California CSLB license | B&P §7048 | $1,000 | Labor and materials of $1,000 or more, or any job needing a permit or using employees | Since 2025 |
| California license bond | CSLB | $25,000 | LLCs add a $100,000 worker bond and liability insurance | Current |
| NYC home improvement license | DCWP | $20,000 bond | Or enroll in the trust fund; a qualifier must pass the exam | Current |
| Small contractor exception | §460(e) · §448(c) | $32,000,000 | Average receipts at or under, and expected completion within two years: PCM not required | 2026 |
| Residential contract exception | §460(e) · P.L. 119-21 §70430 | 80% of costs | Now covers apartments and condos; contracts entered into in tax years beginning after July 4, 2025 | Since 2025 |
| 100% bonus depreciation | §168(k) · Form 4562 | 100% | Qualified property acquired after January 19, 2025; permanent | Current |
| §179 | Form 4562 | $2,560,000 | Phase-out above $4,090,000; SUV cap $32,000 | 2026 |
| NC depreciation adjustment | D-400 Schedule S, CD-405 | 85% add-back | Deduct 20% a year over the next five years; California and New York don't conform either | Current |
| 1099-NEC threshold | Payments to unincorporated subs | $2,000 | Payments made from 2026; indexed from 2027 | From 2026 |
| Davis-Bacon | Federal projects · WH-347 | $2,000 | Federal contracts over this pay prevailing wages with weekly certified payroll | Current |
| California public works | DIR registration | $1,000 / $400 | Prevailing wages over $1,000; registration $400 a year | 2026 |
| NY Fair Play Act | Labor Law Article 25-B | $2,500 / $5,000 | Per misclassified worker for willful violations (first / repeat within five years) | Current |
| Section 232 steel, aluminum, copper | Importers | 50% / 25% | Full value since April 6, 2026; not on goods with 15% or less metal by weight | 2026 |
| Section 232 timber | Softwood lumber / cabinets, vanities | 10% / 25% | Cabinets and vanities 50% from January 1, 2027 | Since Oct. 2025 |
| Canadian softwood lumber AD/CVD | "All others" | 24.72% | Seventh review final results (amended November 19, 2026), plus 10% under Section 232 | 2026 |
| Form 5472 | 25%+ foreign-owned U.S. companies | $25,000 | Initial penalty per missed form per year | Current |
Common mistakes
Mistake: "Split the job into a few contracts and you don't need a general contractor license."
North Carolina's $40,000 test looks at the total cost of the single project, and California requires a license at $1,000, or whenever a permit is required or employees are used. Unlicensed contractors can lose the right to collect and face fines, and in California an unlicensed "sub's" workers are treated as your employees.
Mistake: "They all signed 1099s, so they aren't employees."
Construction is a misclassification enforcement priority. California's AB5 and New York's Fair Play Act presume workers are employees, and in North Carolina a GC is liable for workers of a sub with no comp coverage. Problems usually surface at the year-end workers' comp audit or after an injury.
Mistake: "Adding sales tax to the owner's invoice is the safe choice."
For capital improvements, North Carolina, California and New York all have the contractor pay tax on materials and leave the contract price untaxed, and North Carolina treats tax stated on such an invoice as collected in error. Repairs and maintenance are different: North Carolina and New York tax them.
Mistake: "It's not income until we're paid, so collect less in December."
Long-term contracts default to percentage of completion, which follows costs, not collections. Only residential contracts and contracts that meet the $32 million and two-year tests are excepted, and changing methods requires Form 3115.
Which path fits your situation?
Start with what kind of work you do: residential remodeling, commercial general contracting, specialty subcontracting, a foreign engineering company building in the U.S., or importing and distributing materials. Then use the cases below to choose licenses, entity and priorities.
- Case A: a small residential remodeler in North Carolina. Any single project of $40,000 or more needs a general contractor license (a residential license works). Pre-1978 homes require lead-safe certification. Pay tax on materials for capital improvements, register and file the E-500 for repair services, and carry workers' comp once you have three employees. Once profits are steady, consider an S corporation (see yclcpa.com/scorp).
- Case B: a home improvement contractor in California or New York. In California, get the CSLB license and $25,000 bond, add the $100,000 worker bond and liability insurance if an LLC holds the license, and vet subs against §2781. In NYC, get the DCWP home improvement license, check county licenses on Long Island and in Westchester, charge sales tax (8.875% in NYC) on repairs, and collect ST-124s on capital improvements.
- Case C: a commercial GC going after bigger jobs. Build a bonding line first: job costing, a WIP schedule and CPA-prepared financial statements. Check whether your receipts allow the small contractor exception, and get prevailing wage and certified payroll ready for public work. See yclcpa.com/financials.
- Case D: a Chinese or Korean engineering company building a plant for its parent or a customer. Decide whether to contract through a U.S. subsidiary or as the foreign company, and assess PE and state tax exposure. Handle payroll withholding for seconded staff, totalization and visas separately, decide withholding on payments to the parent and foreign subs from their W-8BEN-E forms, and file 5472 every year. See yclcpa.com/subsidiary.
- Case E: you import cabinets, stone, tile or lighting and sell to contractors. Work out Section 232, Section 301 and AD/CVD by HTS code and origin, and who is the importer. Take resale certificates from contractors or tax them under each state's rules. For online and marketplace channels see yclcpa.com/cabinet and yclcpa.com/homedepot.
We handle bookkeeping, payroll, sales tax and annual returns for construction contractors
What makes contractor books hard is job costing, the revenue recognition method, sales tax on materials and labor. We're in Cary, North Carolina, know North Carolina and its neighbors well, and also work with contractors and foreign-owned engineering companies in California, New York and other states. One team handles formation, state registrations, sales tax, payroll and 1099s, WIP schedules, revenue methods and depreciation planning, and annual returns. Licensing, contracts and job site disputes are handled by attorneys and licensing boards, and customs entries by your customs broker; we coordinate on the tax side.
- Big Four background, 15+ years in U.S. tax, 10 years of U.S.–China cross-border work, credentialed as CPA, EA and CAA
- Company formation, EIN, North Carolina and other state registrations, sales tax (NC RMI, NY repair services), payroll, workers' comp audit support and 1099s
- Job-cost bookkeeping, WIP schedules and financial statements, §460 method choices and Form 3115, equipment depreciation and state adjustments
- 1120 + 5472, BE-13, 1042-S, payroll withholding for seconded staff and the tax file on PE for foreign-owned engineering companies
How it works
- 1
Free assessment
a free 15-minute call to hear what kind of work you do and where, and get a first read on licensing, entity, revenue method and labor risks.
- 2
Plan
entity and state, revenue method, and how sales tax and payroll will run, with a written checklist and quote.
- 3
Setup
company formation, EIN, sales tax and payroll accounts, and a job-cost chart of accounts, coordinated with your attorneys and insurance broker.
- 4
Ongoing and year-end
monthly bookkeeping and WIP schedules, sales tax, payroll, 1099s, and federal and state returns; if a tax agency writes, the same team answers.
FAQ
How big a job needs a general contractor license in North Carolina?
Any single project costing $40,000 or more needs a North Carolina general contractor license from the NCLBGC. A limited license covers projects up to $750,000, intermediate up to $1.5 million, and unlimited has no cap, all excluding land costs. Electrical, plumbing and HVAC work needs a specialty license at any amount, and pre-1978 homes need lead-safe certification.
Do construction contractors have to use the percentage-of-completion method for taxes?
Not always. Long-term contracts default to the §460 percentage-of-completion method, but residential construction contracts (including apartments since the 2025 law) are exempt. Other contracts are exempt if the contractor's average gross receipts for the prior three years don't exceed $32 million (2026) and the job is expected to finish within two years. Changing methods generally requires Form 3115.
Can a contractor charge the owner sales tax on materials it already paid tax on?
Not on a capital improvement. North Carolina, California and New York all treat these contractors as the consumer of materials: they pay tax when buying, and the contract price isn't taxed. North Carolina treats tax stated on such an invoice as collected in error. Repairs and maintenance are different: North Carolina and New York tax them as services.
What's the risk of paying every sub on a 1099?
If you actually control how the workers do the job, they can be reclassified as employees, with back payroll taxes, workers' comp premiums and penalties. California's AB5 and New York's Fair Play Act presume construction workers are employees, and New York's penalty for willful misclassification runs up to $2,500 per worker. Real subs paid $2,000 or more from 2026 get a 1099-NEC.
Can YCL help my construction company?
Yes. YCL CPA (yclcpa.com) is in Cary, North Carolina, and handles formation, state registrations, job-cost bookkeeping and WIP schedules, sales tax, payroll and 1099s, revenue method and depreciation planning, and annual returns for construction companies, plus 5472, BE-13 and cross-border withholding for foreign-owned engineering firms. Attorneys handle licensing and contracts, and we coordinate. Results depend on the facts and on the tax agencies. Start with a free 15-minute call.
Related guides
- Business & Self-EmployedWhat payroll taxes does a small business owe, and which forms does it file?
- Business & Self-EmployedForm 1099-NEC: who has to file it, and how do I report one I received?
- Business & Self-EmployedNorth Carolina sales tax: how do I register, what's the rate, and when is Form E-500 due?
Sources
- Census Bureau: Construction Spending (December 2025 data, released February 2026; September 2026 data, released November 2, 2026); BLS: Construction, NAICS 23 (October 2026, preliminary)
- North Carolina: G.S. 87-1, 87-10, 87-43 and 143-134.1; NCLBGC; NCBEEC; G.S. 97-19; G.S. 64-26; NCDOR SUTB 72-3 and 49-3 (January 2026 edition), Forms E-589CI and E-595E; NCDOR guidance on the bonus depreciation adjustment
- California: CSLB licensing, bond and LLC guidance (2025–2026); CSLB #25-04, New Laws Affecting Contractors Starting in 2026 (December 29, 2025); SB 1455 and SB 291; Labor Code §§2750.5, 2781, 1771 and 1725.5; DIR public works registration and FAQ (April 2026); Civil Code §8811 (SB 61, effective January 1, 2026); CDTFA Regulation 1521 and Lumber Products Assessment guidance
- New York: Labor Law §§240 and 220 and Article 25-B (Construction Industry Fair Play Act) with DOL guidance; GBL §§756-a and 756-c (amended November 17, 2023; S5655 signed December 19, 2025); Department of Taxation and Finance TB-ST-104, ST-124, ST-120.1 and Publication 862; NYC DCWP home improvement contractor license checklist
- IRC §§460, 448(c), 168(k), 179, 1245 and 6041; P.L. 119-21 §§70430 and 70433; Rev. Proc. 2025-32 (2026 inflation adjustments); Rev. Proc. 2026-32; Rev. Rul. 69-314; Instructions for Forms 3115, 8697, 1099-NEC and 5472
- DOL Wage and Hour Division: Davis-Bacon and Related Acts (final rule effective October 23, 2023); OSHA 29 CFR 1926; EPA Lead Renovation, Repair and Painting Rule
- White House Section 232 proclamations on steel, aluminum and copper (April 2 and June 1, 2026) and timber and lumber (September 29, 2025, with the December 31, 2025 delay); USTR Section 301 on China and the forced-labor Section 301 action (July 2026); Supreme Court, Learning Resources, Inc. v. Trump (February 20, 2026); CBP CAPE
- Commerce and USITC: seventh administrative review final results on Canadian softwood lumber and amendment (October and November 19, 2026); final determinations on hardwood and decorative plywood from China, Indonesia and Vietnam (July 21, 2026) and USITC Pub. 5784 (September 2026); sunset review continuing the ceramic tile orders on China (March 2, 2026); AD/CVD orders on quartz surface products from China, India and Turkey; AD/CVD orders on aluminum extrusions from China
- BEA: BE-13 instructions (revised October 2025); U.S.-China and U.S.-Korea income tax treaties; U.S.-Korea totalization agreement