The U.S. solar and energy storage industry in 2026 — market, AD/CVD and tariffs, clean energy credits, and tax for module makers, installers and storage companies
U.S. solar and storage are still being built at scale, but the rules changed sharply in 2025–2026. The homeowner 25D credit ended after 2025, and solar projects that began construction after July 4, 2026 must be in service by the end of 2027 to get a credit, while storage keeps full credits for projects started through 2033. Imports now face stacked AD/CVD orders, Section 232 duties and forced-labor reviews, and Chinese-owned companies also have to clear the new prohibited foreign entity rules.
- 43.2 GWdc / 57.6 GWh
- U.S. solar installed in 2025, down 14% from 2024, and storage installed in 2025, a record (SEIA with Wood Mackenzie and Benchmark, March 2026)
- July 4, 2026
- Solar and wind facilities that began construction after this date must be placed in service by December 31, 2027 to qualify for 48E/45Y; storage isn't subject to this cutoff
- 15% + $0.38/W
- Section 232 action on polysilicon and derivatives, effective December 4, 2026: 15% on wafers, cells and modules, plus minimum import prices of $0.38 per watt for modules and $0.22 for cells
- Dec. 31, 2025
- The 25D residential clean energy credit doesn't apply to expenditures after this date; third-party-owned systems (leases, PPAs) go through 48E instead
At a glance
- Market: 43.2 GWdc of solar in 2025, 34.7 GWdc of it utility-scale, and a record 57.6 GWh of storage. Q2 2026 added 11.4 GWdc, and the industry expects 2026 to land close to 2025. Residential is shrinking after 25D ended. Texas and California lead.
- Tariffs stack up: Cambodia, Malaysia, Thailand and Vietnam have had AD/CVD orders on cells since June 2025; India, Indonesia and Laos got final determinations in 2026. China already carries the 2012 and 2015 orders plus 50% Section 301 duties. Section 232 adds 15% and minimum import prices on wafers, cells and modules from December 4, 2026. The Section 201 safeguard expired in February 2026.
- Credits: solar 48E/45Y needs either a construction start by July 4, 2026 or a placed-in-service date by the end of 2027. Storage keeps the full credit for construction starts through 2033. The 45X manufacturing credit (4 cents/W for cells, 7 cents for modules, $35/kWh for battery cells) holds through 2029 and then steps down. 25D is over.
- Prohibited foreign entities (FEOC): for tax years beginning after July 4, 2025, a prohibited foreign entity can't claim 45X, 45Y or 48E, and projects starting construction in 2026 or later also have to pass a "material assistance" cost test. A U.S. subsidiary controlled by a Chinese parent needs a review first.
- Three states: in North Carolina, solar work needs an electrical contractor license, contracts of $40,000 or more also need a general contractor license, and there's no sales tax exemption for the equipment. California requires a CSLB license (C-46, C-10 and others) and runs NEM 3.0 net billing. New York exempts solar equipment and installation from state sales tax and offers NY-Sun incentives plus a 25% state credit for homeowners (up to $5,000).
How big is the U.S. solar and storage market, and is it still growing in 2026?
It's large but growing more slowly. According to the SEIA and Wood Mackenzie year-in-review report from March 2026, the U.S. installed 43.2 GWdc of solar in 2025, 14% less than in 2024, yet solar was still the largest source of new generating capacity for the fifth year in a row. Storage installations reached 57.6 GWh in 2025, about 30% more than in 2024. In 2026, utility-scale is rising while residential is falling because the 25D credit ended.
Think of the supply chain in four layers. Upstream are polysilicon, wafers and cells. Midstream are modules, inverters, racking, battery cells and storage systems. Downstream are project development, EPC contractors and installers. At the end are the owners and operators who sell the power. Chinese and Korean companies in the U.S. mostly work in the middle (module plants, storage integration, importing), with some in installation and development; U.S. small businesses are mostly installers and O&M providers.
Description: installed solar and storage by year, the main segments and the leading states, from public SEIA, Wood Mackenzie and Benchmark reports.
| Measure | Number | Source and date |
|---|---|---|
| Solar installed in 2025 | 43.2 GWdc, down 14% from 2024 | SEIA / Wood Mackenzie, 2025 Year in Review (March 2026) |
| Utility-scale share | 34.7 GWdc, down 16% | Same |
| Solar's share of new generating capacity in 2025 | 54%; solar plus storage 79% | Same |
| Top states in 2025 | Texas about 11 GW, California 4.7 GW, Indiana 3 GW | Same |
| Storage installed in 2025 | 57.6 GWh, about 30% more than 2024; residential 3.1 GWh | SEIA / Benchmark, Energy Storage Market Outlook (Q1 2026) |
| Solar installed in Q2 2026 | 11.4 GWdc, up 45% year over year; residential 995 MWdc, down 12% | SEIA / Wood Mackenzie, Q3 2026 report (September 2026) |
| Outlook for 2026 | About 43 GWdc, close to 2025; residential expected to fall 23% for the year | Same |
- Utility-scale carries the market: large ground-mounted plants make up roughly four-fifths of new capacity. Buyers are utilities, independent power producers and large power users, including data centers, whose load growth is a new driver for both solar and storage (see the guide at yclcpa.com/datacenter).
- Residential is changing shape: with 25D gone, homeowners are moving to leases and power purchase agreements (PPAs), where a third-party owner claims 48E. California residential had already shifted to solar plus storage after NEM 3.0 in 2023.
- Manufacturing is growing: the report says U.S. module capacity rose about 50% in 2025, cell capacity began to expand, and the first U.S. wafer capacity since 2016 came online. Actual output is still far below domestic demand, so imports remain the main source.
- Where North Carolina fits: NC is a major solar state in the Southeast with many large ground-mounted projects; its residential and commercial market is shaped by Duke Energy's net metering rules, and storage and battery manufacturing are recent economic development priorities. California is the largest residential and storage market, and New York stands out for community solar and state incentives.
Who regulates solar and storage companies, and which certifications and permits do you need?
No single "solar license" covers everything. Products need safety listings (UL standards); installations follow the electrical and fire codes, need building and electrical permits and an interconnection agreement with the utility; states regulate contractor licensing and rates, and the federal government handles tariffs, imports and tax credits.
- Product listings: modules are generally certified to UL 61730 (safety) and IEC 61215 (performance); inverters to UL 1741 and IEEE 1547 (grid interconnection); storage systems to UL 9540, with UL 9540A fire testing. Most building departments won't issue a permit, and utilities won't approve interconnection, for unlisted equipment.
- Installation codes: the National Electrical Code Articles 690 (PV), 705 (interconnection) and 706 (storage); NFPA 855 and the local fire code for storage; OSHA fall protection on roofs. States adopt different NEC editions.
- Shipping and imports: lithium batteries must pass UN 38.3 testing and follow DOT/PHMSA hazardous materials rules. Inverters and monitoring devices with radios generally need FCC authorization. Portable power stations sold to consumers fall under the CPSC.
- Interconnection and rates: large plants interconnect under FERC and the regional grid operators; residential and commercial net metering and rates belong to the state commissions (NCUC in North Carolina, CPUC in California, the PSC in New York).
- Marketing: pitches such as "free solar" or promised bill savings fall under the FTC and state consumer protection laws, and California has specific disclosure rules for residential solar contracts. Claims need support, and contracts should be reviewed by an attorney.
- End of life: California manages discarded solar panels as universal waste, and battery recycling and transport have their own rules. Recycling and O&M businesses should look at these separately.
State contractor licensing is compared in the North Carolina, California and New York section below. Contracts, license applications and product liability belong with attorneys and certification bodies; YCL handles the tax side.
What duties apply to imported solar modules, cells and storage batteries in 2026?
As of November 2026, solar is one of the most complicated import categories in the tariff schedule. Cells and modules may carry antidumping and countervailing duties (AD/CVD), Section 301 duties (China), the forced-labor Section 301 duty in effect since July 24, 2026, and, from December 4, 2026, Section 232 duties with minimum import prices. Every source also faces review under the Uyghur Forced Labor Prevention Act (UFLPA). The Section 201 safeguard expired in February 2026. Have your customs broker confirm each HTS number against the latest notices.
Description: the measures that stack on cells and modules (HTS 8541.42 and 8541.43, normal duty free) and on lithium-ion storage batteries (HTS 8507.60, normal duty 3.4%). AD/CVD rates vary widely by exporter; confirm against the latest CBP and Commerce notices.
| Origin | Cells and modules | Lithium-ion storage batteries | Watch for |
|---|---|---|---|
| China | 2012 and 2015 AD/CVD orders; Section 301 at 50%; forced-labor Section 301 at 12.5%; Section 232 at 15% plus minimum prices from Dec. 4 | 3.4% + Section 301 at 25% (from Jan. 1, 2026) + 12.5% | Strictest UFLPA scrutiny; Chinese content also affects buyers' FEOC math |
| Cambodia, Malaysia, Thailand, Vietnam | AD/CVD orders since June 2025, from 0 to thousands of percent depending on exporter; Section 232 from Dec. 4 | 3.4% + the forced-labor Section 301 rate for that country's tier | Commerce found circumvention of the China orders in 2023 |
| India, Indonesia, Laos | 2026 final AD/CVD: antidumping 65.43%–123.04%, countervailing 73.20%–173.70%; Section 232 from Dec. 4 | 3.4% + the forced-labor Section 301 rate for that country's tier | Cash deposits since the preliminary determinations; check the Federal Register for the orders |
| Korea, Japan, Taiwan, EU | No AD/CVD; 15% combined under Section 232 from Dec. 4 | 12.5% combined for Korea and Japan, 10% for Taiwan | Origin must be provable, not transshipped |
| Made in the U.S. | No import duty | No import duty | Imported cells, wafers and battery cells still pay the duties above |
Antidumping and countervailing duties (AD/CVD)
- China: the 2012 orders cover Chinese cells, whether or not assembled into modules; the 2015 orders added modules assembled in China from third-country cells and covered Taiwanese cells. The China-wide rates are high enough that importing Chinese modules directly is rarely practical.
- Southeast Asia: in 2023 Commerce found that some products assembled in Cambodia, Malaysia, Thailand and Vietnam circumvented the China orders, and the duty pause under Proclamation 10414 ended June 6, 2024. The new "Solar 3" cases reached final determinations in April 2025, and orders were published on June 24, 2025, covering cells from all four countries whether or not assembled into modules. Rates vary enormously by exporter, and a few Cambodian exporters have countervailing rates above 3,000%.
- India, Indonesia and Laos: the "Solar 4" petitions were filed in August 2025. Commerce issued a preliminary CVD determination for India in February 2026 and preliminary AD determinations in April 2026, then final determinations in September 2026; the ITC voted on October 14, 2026 that the imports injure the U.S. industry. Final antidumping rates are 123.04% for India, 94.36% for Indonesia and 65.43% for Laos; countervailing rates are 126.09% for India, 73.20%–173.70% for Indonesia and 82.03%–153.67% for Laos. The orders were scheduled for November 2026; check the Federal Register.
- How it works: at entry you post cash deposits at Commerce's rates; annual reviews later set the final duty, which can mean a refund or a bill, often years later. As production moves to new countries, new cases can be filed at any time, so check Commerce's ACCESS system and CBP's AD/CVD search before you order.
Section 232: polysilicon and derivatives (effective December 4, 2026)
- 15% duty: Proclamation 11052 (signed August 6, 2026) puts a 15% duty on polysilicon ingots, wafers, cells and modules. For Japan, Korea, Taiwan, Switzerland, Liechtenstein and EU members, the normal duty plus Section 232 totals 15%; the U.K. rate is 10%.
- Minimum import prices (MIP): $21/kg for polysilicon, $100/kg for ingots and wafers, $0.22/W for cells and $0.38/W for modules. At entry the importer certifies that the first arm's-length U.S. sale will be at or above the MIP (or is under a fixed contract signed before August 6, 2026). Without that certification the goods pay a specific duty equal to the MIP; if the entered value is below the MIP, the importer pays the difference. False certifications can lead to a permanent import ban on the importer and its affiliates.
- Interaction with other duties: Section 232 stacks on other duties, but under USTR's notice, goods subject to Section 232 are excluded from the forced-labor Section 301 duty. Companies building U.S. factories can apply for Section 232 relief on equipment and inputs under an approved investment plan.
- Section 201 is gone: the safeguard in place since 2018 (14% in its final year) expired in February 2026; the Section 232 proclamation says it replaces it.
Section 301 (China) and the forced-labor Section 301 duty
- China Section 301 since 2018: after the four-year review, cells (including in modules) went to 50% on September 27, 2024, and polysilicon and wafers to 50% on January 1, 2025. Lithium-ion EV batteries and battery parts went to 25% in 2024, and non-EV lithium-ion batteries, which include most storage batteries, rose from 7.5% to 25% on January 1, 2026.
- Forced-labor Section 301 since July 24, 2026: 12.5% for China, Vietnam and others, or 10% for economies that committed to ban forced-labor imports, stacked on normal duties and existing Section 301 duties; Section 232 goods are excluded.
- IEEPA tariffs: the Supreme Court held on February 20, 2026 that IEEPA doesn't authorize tariffs, and importers of record can request refunds through CBP's CAPE function; the Section 122 10% duty that ran from February 24 to July 24, 2026 has expired. For how to book the refunds, see the tariff section of the guide at yclcpa.com/amazon.
UFLPA: forced-labor review
- The presumption: goods made wholly or partly in Xinjiang, or by an entity on the UFLPA Entity List, are presumed to be made with forced labor and barred from entry unless the importer rebuts that with clear and convincing evidence. Polysilicon is a high-priority sector, and the list includes Hoshine Silicon, Xinjiang Daqo, Xinjiang GCL and East Hope.
- What to prepare: full traceability from polysilicon to module, covering every supplier tier, purchase and production records, shipping documents and, where needed, third-party testing. If CBP detains a shipment, the importer can request an applicability review or file rebuttal evidence, and the goods and cash are tied up in the meantime.
- The tax angle: detained, re-exported or destroyed goods raise questions about how to book the loss, whether it's deductible and how to settle with suppliers, all of which need contracts and documents behind them. We handle the bookkeeping and tax treatment; customs procedures belong to the broker and attorneys.
Who is the importer, and how to cost it
- Importer of record (IOR): the importer posts AD/CVD deposits, certifies minimum import prices and answers UFLPA detentions. With DDP, where a forwarder or factory is the importer, those obligations and any later refunds sit with someone else, and you can't see the entered values or rates.
- Duties are inventory cost: duties, AD/CVD deposits, brokerage and freight go into inventory and reach cost of goods sold when the goods sell. AD/CVD refunded or assessed after an annual review is booked depending on whether the goods are still in inventory.
- Related-party imports: when you buy from a related factory in China or Southeast Asia, U.S. inventory cost generally can't exceed the customs value plus related costs (IRC §1059A), so customs value and transfer pricing have to agree (see yclcpa.com/subsidiary).
Which federal tax credits are left for solar and storage after the 2025 law?
The One Big Beautiful Bill Act (P.L. 119-21), enacted July 4, 2025, cut back solar and wind credits sharply but kept most of the credits for storage and manufacturing. As of November 2026, 25D is over; solar 48E/45Y requires either a construction start by July 4, 2026 or a placed-in-service date by the end of 2027; storage 48E stays at full value for construction starts through 2033; and 45X remains, subject to the prohibited foreign entity rules.
Description: each row is a credit, with who it applies to, the deadline rule and its current status. Confirm figures and dates against the latest IRS and Treasury guidance.
| Credit | Who | Key rule | Status |
|---|---|---|---|
| 25D residential clean energy credit | Owners of their own homes (solar, batteries and more) | No credit for expenditures after Dec. 31, 2025 | Ended; systems finished in 2025 go on Form 5695 with the 2025 return |
| 48E investment / 45Y production credits (solar, wind) | Project owners, including third-party owners of home systems | Construction start by July 4, 2026; later starts must be in service by Dec. 31, 2027 | New projects effectively need to be in service by the end of 2027 |
| 48E / 45Y (storage and other technologies) | Storage owners | Full credit for construction starts through 2033; 75% in 2034, 50% in 2035, then zero | Available |
| 45X advanced manufacturing production credit | U.S. producers that sell components | Cells 4 cents/W, modules 7 cents/W, wafers $12/m², polysilicon $3/kg, battery cells $35/kWh, battery modules $10/kWh; steps down from 2030 | Available, subject to the FEOC and material assistance rules |
| Prohibited foreign entity rules | 45X, 45Y, 48E | Prohibited foreign entities can't claim for tax years beginning after July 4, 2025; projects starting in 2026 or later need a material assistance cost ratio | In effect; interim guidance in Notice 2026-15 (Feb. 12, 2026) |
| §6418 credit transfers | Companies with more credits than tax | One-time cash sale to an unrelated buyer; no sales to specified foreign entities | Available |
Solar projects: the 48E and 45Y start and in-service deadlines
- The rule: solar and wind facilities that begin construction after July 4, 2026 must be placed in service by December 31, 2027 to qualify for the 48E investment credit or the 45Y production credit. Projects that began construction by July 4, 2026 generally get the four-year continuity safe harbor and can be placed in service within the following four calendar years.
- What counts as starting construction: under IRS Notice 2025-42 (August 15, 2025), projects starting on or after September 2, 2025 can show a start only through the physical work test, such as on-site excavation or pile driving, or off-site work on custom, non-inventory equipment under a binding contract. The old 5% cost safe harbor is gone except for small solar facilities of 1.5 MWac or less.
- Credit rate: 6% base, multiplied by five to 30% if the project meets the prevailing wage and apprenticeship (PWA) requirements or is under 1 MWac, with domestic content and energy community bonuses on top and a separate allocation for low-income projects. With the start deadline now past, new solar projects need to be scheduled backward from an end-2027 in-service date.
- Residential leases and PPAs: third-party-owned home solar claims 48E under the same deadlines. The new law denies 48E for leased solar water heating and small wind, but leased home solar and batteries can still qualify.
Storage: the credit stays, the foreign entity rules bite harder
- Full credit through 2033: 48E for storage (at least 5 kWh of capacity) isn't subject to the 2027 cutoff. Construction starts through the end of 2033 get the full credit, 2034 starts get 75%, 2035 starts 50%, and nothing after that.
- Material assistance: storage projects starting construction in 2026 need a material assistance cost ratio (MACR), the share of direct costs not sourced from prohibited foreign entities, of at least 55%, rising to 60% in 2027 and by 5 points a year to 75%. Solar generating facilities need 40% in 2026 and 45% in 2027. Chinese battery cells are a large share of cost, so storage projects are the most likely to fail this test.
- Depreciation: 48E property is still 5-year MACRS property, and property acquired after January 19, 2025 can take 100% bonus depreciation. Basis is reduced by 50% of the investment credit.
Manufacturing: 45X
- Per-unit credit: components produced in the U.S. and sold to unrelated buyers earn 4 cents per watt for cells, 7 cents per watt for modules, $12 per square meter for wafers, $3 per kilogram for polysilicon, several cents per watt for inverters depending on type, $35 per kWh for battery cells and $10 per kWh for battery modules. The credit drops to 75% in 2030, 50% in 2031 and 25% in 2032, and ends in 2033 (wind components end after 2027).
- Foreign entity rules: prohibited foreign entities can't claim 45X for tax years beginning after July 4, 2025. Solar components sold in 2026 need a material assistance cost ratio of at least 50% (60% in 2027); battery components need 60% in 2026 and 65% in 2027.
- Direct pay: any 45X taxpayer can elect direct payment under §6417 for the first five years, and can transfer the credit after that. That matters for a new plant that isn't yet profitable.
Homeowners: 25D is over
- The rule: 25D doesn't apply to expenditures after December 31, 2025. An expenditure is made when installation is complete, so a deposit paid in 2025 for a system finished in 2026 generally doesn't qualify.
- Systems finished in 2025: claim the 30% credit on Form 5695 with the 2025 return; any unused amount carries forward.
- What it means for installers: cash and loan customers lost the 30% credit, so sales are moving to leases and PPAs. The leasing company claims 48E, with solar needing to be in service by the end of 2027 and storage under its own schedule.
Foreign entity rules: who is a "prohibited foreign entity"?
- Two groups: "specified foreign entities," which include government-linked companies of covered nations such as China and "foreign-controlled entities" more than 50% controlled by citizens or companies of a covered nation; and "foreign-influenced entities," where a specified foreign entity can appoint an officer, owns 25% or more alone or 40% or more together, holds 15% or more of the debt, or has "effective control" through contracts.
- U.S. subsidiaries controlled by a Chinese parent: these will generally be foreign-controlled entities and can't claim 45X, 45Y or 48E for tax years beginning after July 4, 2025. A Chinese shareholder with 25% or more may also make the company a foreign-influenced entity. Publicly traded companies have some exceptions. Several Chinese-owned manufacturers have already sold or restructured their U.S. plants.
- This is a complex determination: ownership, debt and technology license agreements all count, and the IRS is still writing rules. Attorneys and tax advisers make the determination together; we handle the return reporting and documentation. General filings for foreign-owned companies (5472, BE-13) are covered below.
Can you sell the credits? How does a §6418 transfer work?
Yes. Under §6418, credits such as 48E, 45Y and 45X can be sold once, for cash, to an unrelated buyer, usually at a discount (for example around $0.90 per $1 of credit, depending on the market). The seller doesn't include the cash in income, and the buyer can't deduct what it pays. Before selling, you register with the IRS through Energy Credits Online for a registration number, then make the election on your return. The new law bars sales to specified foreign entities.
- Steps: after the year the project is placed in service (or the 45X components are sold), complete IRS pre-filing registration, which gives one registration number per project; sign a transfer agreement with the buyer; attach Form 3800 and the transfer election to the seller's timely filed return (including extensions); the buyer claims the credit on its own return.
- One sale, cash only: the buyer can't resell the credit. Payment must be in cash and can be made between the start of the tax year and the seller's filing due date.
- Who carries the risk: if 48E property is disposed of or changes use within five years of being placed in service, the credit is recaptured, and after a transfer the recapture falls on the buyer. A buyer of an overstated credit also owes a 20% penalty. That's why buyers ask for indemnities, insurance and full cost records, and why sellers need cost allocations, proof of construction start, PWA payroll records and the material assistance calculation ready.
- Partnerships and S corporations: the entity makes the election, and the cash is distributed by ownership; owners can't take the credits first and sell them individually.
- Direct pay: §6417 direct pay is mainly for tax-exempt organizations and governments; 45X is the exception, open to any taxpayer for its first five years.
- Foreign buyers: a specified foreign entity can't be the buyer. A foreign-owned U.S. company that wants to buy credits to offset its own tax needs the same analysis first.
How do North Carolina, California and New York compare for solar and storage?
The biggest differences are licensing, rate policy and sales tax. North Carolina requires an electrical contractor license for solar work, has no sales tax exemption for the equipment and generally doesn't allow third-party power sales. California requires a CSLB license, and NEM 3.0 has pushed homes toward solar plus storage. New York has no statewide contractor license, but solar equipment and installation are exempt from state sales tax, with NY-Sun incentives and a state credit for homeowners.
| Item | North Carolina | California | New York |
|---|---|---|---|
| Installer license | Electrical work needs a license from the NC State Board of Examiners of Electrical Contractors (NCBEEC), which has a special restricted category for PV; building work on contracts of $40,000 or more also needs a general contractor license | CSLB license: C-46 Solar, C-10 Electrical or B; any job that needs a permit needs a license whatever the amount (the $1,000 minor work exemption doesn't apply) | No statewide contractor license; NYC electrical work needs a licensed master electrician, and Long Island, Westchester and other counties license home improvement contractors; NY-Sun requires a participating contractor |
| Sales tax on solar equipment | No general exemption; on real property installations the contractor pays tax on materials | No general exemption; partial exemption for manufacturing equipment and a CAEATFA exclusion | Residential and commercial solar equipment and installation exempt from the 4% state tax and the 0.375% MCTD tax; local tax only if the locality has enacted the exemption |
| Sales tax on storage | No exemption | No general exemption | Residential storage exempt from state and local tax from June 1, 2024 to May 31, 2026; check the Tax Department for any extension |
| Property tax | 80% of a solar energy electric system's value excluded (G.S. 105-275(45)) | New active solar systems don't trigger reassessment (R&TC §73) | RPTL §487: 15-year exemption, localities can opt out; NYC has its own abatement |
| Rates and incentives | Duke residential net metering under new rules since October 2023 (time-of-use and more); third-party power sales generally not allowed, with a leasing program in Duke territory | NEM 3.0 net billing (since April 15, 2023); SGIP storage incentives | NY-Sun MW Block incentives; 25% state credit for home solar up to $5,000; Value Stack (VDER) compensation |
| Income / franchise tax | Corporate income tax 2% (2026) plus franchise tax (minimum $200) | Corporate tax 8.84%, minimum $800; LLCs also pay an LLC fee on gross receipts | State corporate tax generally 6.5% (7.25% above $5 million of business income); NYC corporate tax generally 8.85% |
| Minimum wage (2026) | Federal $7.25 | $16.90 | $17.00 in NYC, Long Island and Westchester; $16.00 elsewhere |
| Employee or contractor | Federal and NC general standards | AB5 "ABC test"; treating installers as 1099 workers is high-risk | Strict rules, plus construction wage and insurance requirements |
- North Carolina: lots of large ground-mounted plants, with residential and commercial shaped by Duke's net metering rules. HB 589 (2017) allows only a leasing program in Duke territory, so selling power directly to customers under a PPA is generally not allowed, which is a big difference from California and New York. The 80% property tax exclusion is in effect; H1213, filed in 2025, would end it for systems placed in service on or after July 1, 2027, but as of June 2026 it was still in a House committee. For NC sales tax registration and the E-500, see yclcpa.com/salestax.
- California: the largest residential and storage market. NEM 3.0 pays exported power at avoided-cost rates, which lengthens payback for solar-only homes, so most new systems include a battery. Whether a C-46 contractor can install storage on its own is unsettled: a court blocked CSLB's 2024 restriction, so watch CSLB announcements. The §73 property tax exclusion for new solar was set to expire January 1, 2027, and SB 710 in 2025 changed the timing; check BOE's current guidance.
- New York: a market built on community solar and state incentives, with a goal of 6 GW of storage by 2030. NYC rooftop systems also need to meet FDNY requirements for storage and roof access. Businesses in NYC owe state tax, the city corporate tax or the unincorporated business tax (UBT, 4%), and the Metropolitan Commuter Transportation Mobility Tax (MCTMT).
- Other states: Texas installs the most and has no income tax but does have a franchise tax; Georgia, Ohio and Arizona have large module plants. For where to form and where to register as a foreign company, see yclcpa.com/llc.
How does sales tax work on solar equipment sales and installation?
It depends on whether you sell equipment or install it into real property. Equipment sold on its own is taxed at the buyer's ship-to rate (New York's solar exemption aside). For installations into a home or building, most states treat the installer as a construction contractor who pays tax on materials and doesn't charge tax on the contract. The three states differ, so confirm before you start.
North Carolina
- No general exemption for solar or storage: modules, inverters and batteries sold to end users are taxed at the 4.75% state rate plus county tax (6.75%–8.25% combined).
- Installed into real property: under NC rules, a contractor making a capital improvement to real property is a real property contractor that pays sales or use tax on materials and doesn't charge tax on the contract. Materials bought out of state without tax are subject to use tax.
- Repair and maintenance: NC taxes repair, maintenance and installation (RMI) services to real property, with an exception for capital improvements. How to split an O&M contract depends on NC's rules.
- Sales for resale: sales to other installers or distributors are exempt with an NC E-595E resale certificate.
California
- No general exemption: retail sales of solar modules and storage batteries are taxed from 7.25%, plus local add-ons.
- Construction contractors: under CDTFA Regulation 1521, a contractor is the consumer of "materials" (paying tax when buying them) and the retailer of "fixtures" (charging tax on the sale), so how the contract is written affects who pays and how much.
- Manufacturers: companies making modules or batteries in California can claim the partial exemption on manufacturing equipment or apply to CAEATFA for the advanced manufacturing sales tax exclusion.
New York
- Solar equipment exempt from state tax: sales and installation of residential (Tax Law §1115(ee)) and commercial (§1115(ii)) solar energy systems equipment are exempt from the 4% state tax and the 0.375% MCTD tax; local tax is exempt only where the locality has enacted the exemption.
- Residential storage: exempt from state and local tax from June 1, 2024 to May 31, 2026. The 2026–27 budget proposed a two-year extension; confirm with the Tax Department before invoicing sales made on or after June 1, 2026.
- Keep the paperwork: exempt invoices need an equipment list and the system's use (residential or commercial) in case of an audit.
Marketplaces and out-of-state sales
Marketplaces such as Amazon collect and remit for portable power stations and small panels sold there. For your own website and wholesale, out-of-state sellers register once they pass the thresholds: more than $100,000 a year in North Carolina, $500,000 in California, and $500,000 plus more than 100 sales in New York. A warehouse or employees in a state means you register there regardless.
Which returns do Chinese- and Korean-owned solar and storage companies file in the U.S. each year?
A U.S. company that is 25% or more foreign-owned files Form 5472 with its 1120 every year, and the penalty starts at $25,000 per missed form. When a foreign person acquires 10% or more of the voting interest, the U.S. company files BE-13 within 45 days. Solar and storage companies have two more questions: whether the foreign entity rules block 45X or 48E, and whether related-party purchase prices satisfy both transfer pricing and customs.
- 1120 + 5472: one 5472 per related party, reporting purchases, service fees, technology license fees, loans and interest, and dividends. A single-member LLC owned by one foreign person files a pro forma 1120 with Form 5472 (see yclcpa.com/5472).
- BE-13: due within 45 days when a foreign person directly or indirectly acquires 10% or more of the voting interest; since October 3, 2025, investments of $40 million or less file the exemption claim (see yclcpa.com/be13).
- Payments to the parent: royalties for patents, technology or trademarks used in the U.S., interest and dividends all need a W-8BEN-E and treaty withholding. Under the U.S.-China treaty the rate is generally 10%; under the U.S.-Korea treaty it's 12% on interest, 15% on royalties (10% for copyrights) and 15% or 10% on dividends. File Forms 1042 and 1042-S by March 15 of the following year (see yclcpa.com/w8ben).
- Transfer pricing and customs: modules or battery cells bought from a related factory must be priced at arm's length under IRC §482 and must match customs value (§1059A). Section 232 minimum import prices and AD/CVD deposits both run off entered value and exporter, so set prices with both in mind.
- Foreign entity reporting: a 45X or 48E claim needs support that you're not a prohibited foreign entity, plus the material assistance calculation. Companies with Chinese ties should review ownership, loans and license agreements together, well before the return is due.
- State returns: NC CD-405, California Form 100 and the $800, New York CT-3 and the NYC return, plus returns in Texas or other states where you have a plant, warehouse or employees.
What should installers watch on payroll, subcontractors and bookkeeping?
An installer is a construction contractor at heart: most crews are employees who need payroll and workers' compensation, subcontractors get a 1099-NEC (from 2026, once you pay $2,000 in a year), revenue follows the construction contract, and inventory, work in progress and warranties are tracked separately. If you build 48E projects for customers, keep prevailing wage and apprenticeship payroll records too.
- Employee or subcontractor: crews scheduled to go up on roofs with company tools and under a project manager's direction are generally employees. California's AB5 ABC test makes treating installers as 1099 workers very risky, and New York and North Carolina also audit for it. Genuinely independent electrical or roofing subs fill out a W-9 and get a 1099-NEC (see yclcpa.com/1099nec).
- Payroll taxes: in North Carolina, federal 941 and 940, NC-5 state withholding, NCUI 101 unemployment, and year-end W-2s and NC-3 (see yclcpa.com/payroll). NC generally requires workers' compensation once you have three or more employees.
- Prevailing wage and apprenticeship (PWA): a 48E project of 1 MWac or more needs PWA to reach 30%: workers are paid at least the Department of Labor's local prevailing wage during construction, apprentice ratios are met, and payroll records are kept week by week. Customers and credit buyers will ask you for them, so your payroll has to support it.
- Revenue recognition: long-term construction contracts generally use the percentage-of-completion method; contractors under the §448(c) small business gross receipts threshold can use simpler methods such as completed contract. Track deposits, progress billings and retainage separately.
- Inventory and warranties: modules, inverters and batteries are carried at purchase cost plus duties and freight; module and storage warranties run 10–25 years, and warranty costs are generally deducted when incurred.
- Financing and dealer fees: if you work with lenders or leasing companies, how you book dealer fees, rebates and incentives affects gross margin and sales tax.
- Your own equipment: trucks, tools and warehouse equipment acquired after January 19, 2025 generally qualify for 100% bonus depreciation. North Carolina doesn't follow federal bonus depreciation, so most of it is added back and deducted over several years on the state return.
Example: how do the credits and taxes work on a 500 kW commercial solar-plus-storage project in North Carolina?
Example (hypothetical numbers, to show the method): a logistics company near Raleigh, a C corporation owned by U.S. persons and confirmed not to be a prohibited foreign entity, signs a contract in September 2026 to put 500 kWac of solar and 1 MWh of storage on its own warehouse roof, and places it in service in June 2027. Eligible solar cost is $900,000 and storage $500,000. Because construction began after July 4, 2026, the solar must be in service by the end of 2027. The project is under 1 MWac, so it gets 30% without PWA. It doesn't claim the domestic content or energy community bonuses.
| Item | Amount | Notes |
|---|---|---|
| Solar 48E (30%) | $270,000 | $900,000 × 30%; requires placing in service by the end of 2027 |
| Storage 48E (30%) | $150,000 | $500,000 × 30%; not subject to the 2027 deadline |
| Total credit | $420,000 | Material assistance: solar needs ≥ 40% and storage ≥ 55% (2026 start) |
| Option A: use it | Offsets 2027 federal tax | General business credit limits apply; unused credit carries back 1 year and forward 20 |
| Option B: transfer to an unrelated buyer (assume $0.92 per $1) | $386,400 in cash | Not taxable income; IRS registration first; the buyer takes the 5-year recapture risk |
| Depreciable basis | $1,190,000 | $1,400,000 − 50% of the credit ($210,000) |
| 100% bonus depreciation | $1,190,000 deducted in 2027 | About $249,900 less federal tax at 21%; 5-year MACRS is the alternative |
| NC income tax | Most bonus depreciation added back | NC doesn't follow federal bonus depreciation; deducted over several years |
| NC property tax | 80% of the solar portion excluded | Whether storage qualifies is up to the county assessor |
| Sales tax | Installer pays NC sales tax on materials | Built into the contract price; the owner pays no separate tax |
What to watch on this project: if the solar isn't in service by the end of 2027, the $270,000 solar credit is lost, while the storage credit isn't affected. The material assistance ratio has to be tested on the equipment list before construction starts; if Chinese battery cells and inverters make up too much of the cost, the storage credit can disappear entirely. If the company transfers the credits, the IRS registration has to be done before it files its 2027 return, along with the cost allocation, start-of-construction and placed-in-service records the buyer will want. Whether and how much the company actually gets depends on the facts and on the IRS.
What does the timeline look like from setup to the first project in service?
Settle structure, state and supply chain first (who is the importer, where the batteries and cells come from), then form the company, get licensed and register for sales tax. For each project, check the deadlines and foreign entity rules before signing, then build and place it in service. Credit transfers and tax returns come the year after.
Description: from structure and supply chain planning to the returns and credit transfer after the first project is placed in service, with who handles each step.
| When | What to do | Who |
|---|---|---|
| Month 0 | Choose structure (subsidiary or branch, LLC or C corporation) and state; assess how the foreign entity rules affect 45X and 48E | YCL (tax), attorneys |
| Month 1 | Form the company, registered agent, EIN, bank account; BE-13 within 45 days if foreign-owned | YCL |
| Months 1–3 | Contractor licenses (NC NCBEEC / NCLBGC, CA CSLB, local NY); insurance and bonds | License holder, attorneys, insurance broker |
| Months 1–3 | Importer number, customs bond, HTS classification, AD/CVD and Section 232 estimates, UFLPA traceability file | Customs broker |
| Before first sale or job | Sales tax registration (or New York exemption paperwork), resale certificates; payroll tax accounts, workers' compensation | YCL |
| Before each project contract | Check start and in-service deadlines, material assistance ratio, whether PWA applies | YCL, project counsel |
| During construction | Project accounting: cost allocation, start-of-construction proof, PWA payroll records | YCL |
| Early the year after placing in service | IRS pre-filing registration (Energy Credits Online), negotiate the transfer agreement | YCL, buyer |
| March 15 of the following year | Forms 1042 and 1042-S (fees, interest, dividends to a foreign parent); partnership and S corporation returns | YCL |
| April 15 of the following year | 1120 + 5472, Form 3468 / 3800 and the transfer election, state returns (extensions extend filing, not payment) | YCL |
Key rules at a glance
| Item | Who / form | Number / rule | Notes | Year |
|---|---|---|---|---|
| 48E / 45Y (solar, wind) | Project owners · Form 3468 / 8835 | July 4, 2026 / Dec. 31, 2027 | Later starts must be in service by end of 2027; start shown by the physical work test (Notice 2025-42) | P.L. 119-21 |
| 48E (storage) | Storage owners | Full credit through 2033 starts | 75% in 2034, 50% in 2035, then zero | Current |
| 48E credit rate | Projects | 6% / 30% | 30% with PWA or under 1 MWac; bonuses extra | Current |
| 45X solar components | U.S. manufacturers · Form 7207 | 4 / 7 cents per watt | Cells / modules; steps down from 2030, zero in 2033 | Current |
| 45X batteries | U.S. manufacturers · Form 7207 | $35 / $10 per kWh | Cells / modules | Current |
| Material assistance ratio | 2026 starts / sales | 40% / 55% / 50% / 60% | Solar facilities / storage / 45X solar components / 45X battery components; rising each year | 2026 |
| 25D residential credit | Homeowners · Form 5695 | Ended | No credit for expenditures after Dec. 31, 2025 | From 2026 |
| §6418 transfer | Seller · Form 3800 | Once, for cash | IRS registration first; no sales to specified foreign entities; 20% penalty on buyers of overstated credits | Current |
| Section 232 polysilicon and derivatives | Importers | 15% + minimum prices | Modules $0.38/W, cells $0.22/W, wafers $100/kg, polysilicon $21/kg | From Dec. 4, 2026 |
| Southeast Asia AD/CVD | Cells and modules from KH, MY, TH, VN | By exporter | Orders of June 24, 2025; whether or not in modules | Since 2025 |
| India, Indonesia, Laos AD/CVD | Cells and modules | AD 65.43%–123.04% | CVD 73.20%–173.70%; ITC injury vote Oct. 14, 2026 | 2026 |
| China Section 301 | Chinese goods | 50% / 25% | Cells, wafers, polysilicon 50%; non-EV lithium batteries 25% from Jan. 1, 2026; plus forced-labor 301 at 12.5% (Section 232 goods excluded) | 2026 |
| Form 5472 | 25%+ foreign-owned U.S. companies | $25,000 | Initial penalty per missed form per year | Current |
| New York solar equipment | Residential, commercial · §1115(ee), (ii) | Exempt from 4% state tax | And the 0.375% MCTD tax; local tax only if enacted | 2026 |
| NC solar property tax | G.S. 105-275(45) | 80% excluded | H1213 would repeal it; not passed as of June 2026 | 2026 |
| 1099-NEC threshold | Payments to subcontractors | $2,000 | Payments made from 2026 | From 2026 |
Common mistakes
Mistake: "The solar credit has years left, so there's no rush."
Solar and wind facilities that began construction after July 4, 2026 must be in service by December 31, 2027 to get 48E or 45Y. Any new solar project signed now has to be scheduled backward from that date. Storage isn't subject to the cutoff and can be planned on its own.
Mistake: "Assembling in Southeast Asia or India gets around the China tariffs."
Cambodia, Malaysia, Thailand and Vietnam have had AD/CVD orders on cells since 2025, and India, Indonesia and Laos reached final determinations in 2026. Section 232 adds 15% plus minimum import prices on wafers, cells and modules from every origin from December 4, 2026, and UFLPA traces the polysilicon back to its source.
Mistake: "It's our own U.S. factory, so 45X is ours."
A U.S. subsidiary controlled by a Chinese parent will generally be a foreign-controlled entity and can't claim 45X, 45Y or 48E for tax years beginning after July 4, 2025. Even companies that aren't prohibited entities face the material assistance test from 2026. Get the determination before you invest.
Mistake: "Customers installing in 2026 can still take the 30% credit."
25D ended for expenditures after 2025, and the expenditure happens when installation is complete. Telling homeowners today that they'll "get 30% back" can violate consumer protection rules; with a residential lease, the leasing company claims 48E.
Which path fits your situation?
Start with where you sit in the U.S. supply chain: importing, manufacturing, developing and owning projects, or installing. Then use the cases below to pick a structure and priorities.
- Case A: you import modules or storage systems and sell to U.S. installers and developers. Decide who is the importer, model AD/CVD, Section 232 and minimum import prices by origin, and build a UFLPA traceability file. Usually a U.S. C corporation acts as importer, formed in the warehouse state, filing 1120 + 5472 every year.
- Case B: you're building a module, battery or storage plant in the U.S. Get the foreign entity determination first, then model 45X, state incentives (such as NC's JDIG, approved on new jobs and investment) and Section 232 equipment relief; 45X allows direct pay for the first five years. Ownership, technology licenses and financing are designed with attorneys and tax advisers; for general manufacturing issues see yclcpa.com/factory.
- Case C: you develop and own commercial or utility-scale projects. Schedule solar backward from an end-2027 in-service date and plan storage separately. Projects of 1 MWac or more need PWA. If you can't use the credits, plan a §6418 transfer or bring in a tax equity investor.
- Case D: you install residential and small commercial systems. Get the right licenses (NC electrical, CA CSLB, local NY), handle sales tax state by state, book lease and PPA arrangements and dealer fees cleanly now that 25D is gone, and put crews on payroll.
- Case E: you only sell portable power stations or small panels on Amazon and similar marketplaces. The marketplace collects sales tax, but import duties, battery shipping rules, FCC and CPSC still apply, and foreign sellers also face 5472 and state tax questions (see yclcpa.com/amazon and yclcpa.com/battery).
We handle the company, credit and cross-border tax side for solar and storage companies
Solar and storage is one of the industries where tariffs, credits and foreign ownership rules change fastest. We're in Cary, North Carolina, know North Carolina and its neighbors well, and have worked on U.S.-China cross-border tax for 10 years. One team handles company formation, state registrations, sales tax and payroll, 45X and 48E credit claims and §6418 transfers, 5472 and BE-13 for foreign-owned companies, and withholding on payments to a foreign parent. Customs entries and AD/CVD are handled by your customs broker, and licensing, contracts and legal opinions on foreign entity status by attorneys; we coordinate on the tax side.
- Big Four background, 15+ years in U.S. tax, 10 years of U.S.–China cross-border work, credentialed as CPA, EA and CAA
- Company formation, EIN, North Carolina and other state registrations, sales tax (including New York's solar exemption), payroll and 1099s
- Project accounting: cost allocation, duties and AD/CVD in inventory cost, PWA payroll records, credit and depreciation calculations
- 1120 + 5472, BE-13, 1042-S and transfer pricing documentation for foreign-owned companies, and the tax file for §6418 transfers
How it works
- 1
Free assessment
a free 15-minute call to hear where you sit in the supply chain and get a first read on structure, state, credits and the foreign entity rules.
- 2
Plan
structure, state, who imports, and whether to use or transfer the credits, with a written checklist and quote.
- 3
Setup
company formation, EIN, BE-13, sales tax and payroll accounts, coordinated with your customs broker and attorneys.
- 4
Ongoing and year-end
project accounting, sales tax, payroll, credit claims and transfer files, 1042-S, 1120 + 5472 and state returns; if a tax agency writes, the same team answers.
FAQ
Can businesses still get federal solar tax credits in 2026?
Yes, with deadlines. Solar projects that began construction by July 4, 2026 generally have four years to be placed in service; projects starting later must be placed in service by December 31, 2027 to get 48E or 45Y. Storage gets the full credit for construction starts through 2033. The homeowner 25D credit ended for expenditures after 2025.
What duties apply to solar modules imported from Southeast Asia or India in 2026?
Cells and modules from Cambodia, Malaysia, Thailand and Vietnam have carried AD/CVD orders since June 2025, and India, Indonesia and Laos reached final determinations in 2026, with rates that vary by exporter. From December 4, 2026, Section 232 adds 15% on wafers, cells and modules and a $0.38-per-watt minimum import price for modules. Forced-labor Section 301 duties and UFLPA review also apply. Have your customs broker confirm against the latest notices.
Can a module plant owned by a Chinese parent claim 45X?
Probably not. For tax years beginning after July 4, 2025, prohibited foreign entities can't claim 45X, 45Y or 48E, and a U.S. subsidiary more than 50% controlled by a Chinese parent is generally a foreign-controlled entity. Ownership, debt and technology license agreements all matter, so have attorneys and tax advisers make the determination first.
Can we sell solar credits we can't use?
Yes. Under §6418, credits such as 48E, 45Y and 45X can be sold once, for cash, to an unrelated buyer, and the seller doesn't include the cash in income. You first register with the IRS through Energy Credits Online for a registration number and then make the election on a timely filed return. Sales to specified foreign entities aren't allowed.
Can YCL help our solar or storage company?
Yes. YCL CPA (yclcpa.com) is in Cary, North Carolina and has worked on U.S.-China cross-border tax for 10 years. We handle company formation, state registrations, sales tax, payroll, project accounting, 45X and 48E credit claims and transfer files, 5472 and BE-13, and withholding on payments to a foreign parent. Customs is handled by your broker, and licensing and legal opinions on foreign entity status by attorneys, with us coordinating. Results depend on the facts and on the tax agencies. Start with a free 15-minute call.
Related guides
- Cross-BorderA Chinese parent's U.S. subsidiary — do foreign shareholders register with the state, and which filings actually apply?
- Cross-BorderDoes a foreign-owned U.S. LLC file Form 5472? How to prepare and send the pro forma 1120, and what happens if you don't
- Business & Self-EmployedNorth Carolina sales tax: how do I register, what's the rate, and when is Form E-500 due?
Sources
- SEIA / Wood Mackenzie: US Solar Market Insight 2025 Year in Review (March 2026) and Q3 2026 (September 2026); SEIA / Benchmark Mineral Intelligence: US Energy Storage Market Outlook (Q1 2026)
- U.S. Department of Commerce, International Trade Administration: AD/CVD orders on cells and modules from China (A-570-979, C-570-980, A-570-010, C-570-011) and Taiwan (A-583-853); AD/CVD orders on cells from Cambodia, Malaysia, Thailand and Vietnam, Federal Register 2025-11588 and 2025-11589 (June 24, 2025) and correction (July 7, 2025); final determinations for India, Indonesia and Laos (September 2026)
- USITC: Crystalline Silicon Photovoltaic Cells from India, Indonesia, and Laos, Inv. Nos. 701-TA-772-774 and 731-TA-1756-1758 (Final) (vote October 14, 2026; notice November 2, 2026)
- The White House: Proclamation 11052, Adjusting Imports of Polysilicon and Its Derivatives (August 6, 2026), Federal Register 2026-16400 (August 11, 2026)
- USTR: Section 301 four-year review modifications for China (September and December 2024); forced-labor Section 301 action and fact sheet (July 2026); CBP CSMS #69326983
- CBP: UFLPA and the UFLPA Entity List; IEEPA duty refunds (CAPE)
- P.L. 119-21 (July 4, 2025); IRS Notice 2025-42 (beginning of construction, August 15, 2025); Notice 2026-15 and IR-2026-23 (material assistance, February 12, 2026); IRC §§25D, 45X, 45Y, 48E, 6417, 6418, 7701(a)(51)
- IRS: Elective Pay and Transferability FAQs; Energy Credits Online; Instructions for Forms 3468, 7207, 3800, 5695 and 5472
- BEA: BE-13 instructions (revised October 2025)
- North Carolina: G.S. 87-1 and 87-43.3; NCBEEC and NCLBGC; G.S. 105-275(45); H1213 (2025–2026 session); NCDOR guidance for real property contractors; NCUC orders on Duke net metering (2023)
- California: CSLB notice on AB 2622 ($1,000 from January 1, 2025); CPUC net billing tariff (NEM 3.0) decision; CDTFA Regulation 1521; BOE guidance on R&TC §73; CAEATFA sales and use tax exclusion
- New York: Tax Law §1115(ee) and (ii); TSB-M-24(1)S (residential energy storage); RPTL §487; NYSERDA NY-Sun; Tax Law §606(g-1)
Bringing a solar or storage business to the U.S., or growing one?
Book a free 15-minute call. A CPA will look at your structure, state, credit deadlines and how the foreign entity rules affect you, and the returns due in your first year, with no fee and no sales pitch.