IndustriesData centersSales tax exemptionsServer depreciation

Data centers and cloud services in the U.S.: site selection, power costs, sales tax exemptions and server depreciation

Short answer

For data centers and cloud companies, the tax picture starts with power and equipment: a certified North Carolina datacenter still buys equipment free of sales tax, but its electricity is taxed at 7% from August 2026, and servers can be written off in year one federally while North Carolina, California and New York adjust. GPUs imported for U.S. data centers are exempt from the Section 232 chip tariff. Foreign owners file Form 5472, and export controls and CFIUS are for attorneys.

Questions? Reach us directly

Message us on WhatsApp

Scan the code with WhatsApp, or tap the button if you are on your phone.

919-802-8376Open WhatsApp

Add us on WeChat

Scan the code with WeChat, or copy the WeChat ID and search for it in the app.

WeChat ID: YCLUSA
FacebookInstagramXRednoteWeChat Channels
$75,000,000
North Carolina "qualifying datacenter": owners, users and tenants together invest at least $75 million in private funds within five years, certified in writing by the N.C. Department of Commerce; servers, cooling, UPS and other support equipment and software are exempt from sales tax
7%
North Carolina repealed the electricity exemption for certified datacenters: billing periods beginning on or after August 6, 2026 are taxed at 7%, and buyers file a separate report within 30 days after each quarter
100%
Servers, network and storage equipment (generally 5-year property) acquired after January 19, 2025 can be fully expensed federally; North Carolina adds back 85%, and California and New York don't conform
25%
Section 232 tariff on certain advanced computing chips and derivative products since January 15, 2026; imports for use in U.S. data centers are exempt
01

At a glance

  • Power decides the site: data centers used 4.4% of U.S. electricity in 2023 and could reach 6.7%–12% by 2028. North Carolina, Virginia and Texas have cheaper power and equipment exemptions; California's power is expensive, and New York paused state environmental permits for new projects of 50 MW or more in July 2026.
  • State incentives are tightening: North Carolina kept its equipment exemption but taxes datacenter electricity at 7% from August 2026; Virginia kept its exemption and added a $0.011/kWh electricity tax; California and New York have no data-center-specific sales tax exemption.
  • Servers are expensed in year one: servers, GPUs and switches acquired after January 19, 2025 qualify for 100% bonus depreciation; buildings are 39-year property; North Carolina adds back 85%, and California and New York don't follow, so you need three depreciation schedules.
  • Tariffs layer by use and origin: advanced computing chips pay 25% under Section 232 unless imported for U.S. data centers; Chinese servers and parts follow the Section 301 lists; USMCA-qualifying goods from Mexico are exempt from the forced labor Section 301 tariff.
  • Foreign-owned operators: file Form 5472 every year and BE-13 within 45 days of setting up or expanding. Export controls, CFIUS and data security rules are for attorneys; we make sure the structure, money flows and filings work on the tax side.
02

What does the U.S. data center and cloud market look like now?

AI is driving data center construction and power demand up at the same time. A Lawrence Berkeley National Laboratory (LBNL) report for the Department of Energy estimates data centers used 4.4% of U.S. electricity in 2023 and could use 6.7%–12% by 2028. By 2026, what holds projects back is usually not money but grid interconnection, local approvals and tighter state rules on power pricing and tax breaks.

A few public data points:

  • Power use: LBNL's December 2024 report says U.S. data center electricity use grew from 58 TWh in 2014 to 176 TWh in 2023 and could reach 325–580 TWh by 2028.
  • Construction spending: Private data center construction keeps setting records in the Census Bureau's monthly construction spending data. KPMG's October 1, 2026 read of the August data puts it at about $85 billion at an annual rate, up 73.2% from a year earlier.
  • Power prices: Preliminary EIA data for September 2026 put average industrial electricity prices at 6.99 cents/kWh in Texas, 8.45 in North Carolina, 9.86 in Virginia, 10.20 in New York and 24.17 in California, against a U.S. average of 9.52. Data centers usually buy under large-customer contracts, so actual prices depend on the contract.
  • A North Carolina example: On June 4, 2025, the governor announced that Amazon (AWS) plans to invest about $10 billion in a cloud and AI campus in Richmond County, with at least 500 jobs, and the county approved cash grants tied to the project's property taxes. Western North Carolina already hosts data centers for Apple, Google and Meta, among others.
Figure 1 Siting a data center: tax and power rules in five states (as of November 2026)

Description: One row per state, with the equipment sales tax exemption threshold, the tax on electricity, the industrial power price and the main 2026 changes. State rules change quickly; check the state revenue department, utility commission and governor's announcements.

StateEquipment sales tax exemptionElectricityIndustrial price (Sept. 2026, cents/kWh)2026 changes
North CarolinaQualifying datacenter: $75M invested over 5 years plus wage and health insurance conditions; servers, cooling, power equipment and software exemptBilling periods from Aug. 6, 2026 taxed at 7%, with a separate quarterly report8.45Electricity exemption repealed (Session Laws 2026-41 and 2026-42); equipment exemption kept
VirginiaComputer equipment and software exempt: $150M investment and 50 jobs ($70M and 10 jobs in distressed localities), paying 1.5x the local average wage; through June 30, 2035$0.011/kWh electricity tax from July 1, 2026 to June 30, 2028, capped at $600M a year statewide9.86Exemption kept but under legislative review; Dominion's new 25 MW+ rate class takes effect January 2027 with 14-year contracts
TexasQualifying data center: $200M, 20 jobs, 100,000 sq. ft.; state 6.25% exempt for 10 or 15 years; large projects $500M and 40 jobs for 20 yearsElectricity covered, with a predominant use study; local tax still applies6.99SB 6 (2025) set rules for 75 MW+ large loads; bills to repeal the exemption filed for the 2027 session
CaliforniaNo data-center-specific exemptionElectricity not subject to sales tax24.17Seven data center bills signed September 21, 2026, mostly effective January 1, 2027; CPUC data center tariffs due by 2028
New YorkNo statewide data-center-specific exemption; local industrial development agencies (IDAs) can grant project benefitsCommercial electricity generally taxable10.20July 14, 2026 executive order pauses state environmental permits for new 50 MW+ projects for up to a year; the governor proposed ending data center tax breaks

A few observations:

  • The grid queue is the long pole: large customers sign long-term contracts, post collateral for interconnection and commit to minimum demand. Dominion's new Virginia class requires 14-year contracts; Texas SB 6 puts more interconnection cost on loads of 75 MW or more and lets the grid operator curtail them in emergencies.
  • North Carolina's position: cheap power and an equipment exemption, often with county grants tied to property taxes. But the 2026 repeal means 7% belongs in every power cost model.
  • New York and California: expensive power and tight grids, and both states adopted data-center-specific pricing and permitting rules in 2026. New York's market is mostly smaller colocation, edge and enterprise sites; California's is concentrated in Silicon Valley around Santa Clara.
  • Other states: Arizona, Georgia, Ohio, Oregon, Iowa and others have their own exemptions or incentives, and many are tightening them. This guide compares North Carolina, California and New York, with Virginia and Texas as reference points; check other states separately.
03

How do North Carolina, Virginia, Texas, California and New York tax data center equipment and power?

North Carolina, Virginia and Texas have data-center-specific sales tax exemptions, with investment thresholds from $75 million to $200 million plus job or wage requirements; California and New York don't. The 2026 change is about power: North Carolina repealed its electricity exemption and Virginia added an electricity tax. Exemptions require certification first, and missing the investment target means paying the tax back.

North Carolina: equipment exemption kept, electricity taxed from August 2026

  • Qualifying datacenter: Under G.S. 105-164.3, a datacenter must meet all of these: the N.C. Department of Commerce determines in writing that owners, users and tenants have invested or will invest at least $75 million in private funds within five years of the first investment (only investments from 2012 on count); it meets the wage standard for its county's development tier (tier one counties have none); and it provides health insurance to full-time employees, with the employer paying at least 50% of premiums.
  • What's exempt: G.S. 105-164.13(55a) exempts "datacenter support equipment," including server and computer hardware and software; power equipment such as UPS systems, batteries and power distribution units; cooling such as chillers, cooling towers, air handlers and pumps; and related computer research equipment. The equipment must be capitalized for federal tax purposes. Software sold to a datacenter operator and used in the datacenter has its own exemption (G.S. 105-164.13(43a)).
  • Large internet datacenters: A separate "eligible internet datacenter" category requires $250 million invested within five years, use primarily for software publishing or internet activities, and location in certain county tiers (G.S. 105-164.13(55)).
  • Electricity exemption repealed: Session Law 2026-41, signed July 7, 2026, repealed the electricity exemption for both categories, and Session Law 2026-42 made the repeal effective for billing periods beginning on or after August 6, 2026. Electricity is taxed at 7% regardless of county, and buyers must report the tax paid to the N.C. Department of Revenue within 30 days after each quarter, starting October 30, 2026.
  • Missed investment means repayment: If the investment isn't made within five years, the exemption is forfeited and the tax comes due with penalties and interest. A tenant in a certified datacenter can use the exemption, but must give the required exemption certificate and keep its own records.

Virginia and Texas: exemptions kept, but under review

  • Virginia: Va. Code §58.1-609.3(18) exempts data center computer equipment and enabling software for operators that make at least $150 million of new investment and create at least 50 new jobs ($70 million and 10 jobs in distressed localities) paying at least 1.5 times the local prevailing wage, through June 30, 2035. The 2026 budget kept the exemption but added a tax of $0.011 per kWh on data center electricity from July 1, 2026 through June 30, 2028, capped at $600 million a year statewide, and asked for review recommendations by December 15, 2026.
  • Texas: A "qualifying data center" certified by the Comptroller, with $200 million of investment, 20 qualifying jobs in the county and at least 100,000 square feet, is exempt from the 6.25% state sales tax for 10 years (15 years at $250 million or more); a "qualifying large data center project" with $500 million and 40 jobs gets 20 years. Covered items include electricity, electrical and cooling systems, servers, storage, network equipment and software; local sales tax still applies. Bills to repeal the exemption have been filed for the 2027 session; none had passed as of November 2026.

California and New York: no data-center-specific exemption

  • California: There is no data-center-specific sales tax exemption. The partial exemption for manufacturing and R&D equipment (3.9375 percentage points off) is limited by industry code, and data centers generally fall outside it, so confirm item by item. Electricity isn't subject to California sales tax. Seven bills signed September 21, 2026 direct the CPUC to adopt data center tariffs by January 1, 2028, require facilities of 10 MW or more to report energy use to the California Energy Commission, and add water and noise disclosures and CEQA limits.
  • New York: There's no statewide data-center-specific exemption, and commercial electricity is generally taxable. Projects often negotiate sales tax exemptions on construction materials and equipment and payment-in-lieu-of-taxes (PILOT) agreements with local industrial development agencies (IDAs). On July 14, 2026, the governor issued an executive order pausing state environmental permits for new data centers of 50 MW or more for up to a year, and proposed ending tax breaks for data centers. The legislature passed a one-year pause for projects of 20 MW or more in June; check the latest announcements on whether it was signed.
04

What tariffs apply to imported servers, GPUs and network gear?

As of November 2026, ordinary duty on servers and switches is mostly zero; the cost comes from special tariffs. Certain advanced computing chips and derivative products pay 25% under Section 232 unless imported for use in U.S. data centers; Chinese goods follow the China Section 301 lists; and the forced labor Section 301 tariff since July 24, 2026 adds 10% or 12.5% by country of origin, with USMCA-qualifying goods from Mexico exempt. Check by HTS code and origin against the latest CBP guidance.

Figure 2 Import tariffs on data center equipment (as of November 2026)

Description: One row per tariff measure, with the goods and countries covered, the rate, the dates and what it means for data centers. Tariffs change often; check the latest CBP, USTR and Federal Register notices.

MeasureCoversRateDatesWhat it means for data centers
Ordinary duty (MFN)Servers (HTS 8471), parts (8473.30), switches (8517.62) and similarMostly 0CurrentThe cost comes from the layers below
Section 232 semiconductors (phase one)Certain advanced computing chips and derivative products, all countries25%Since Jan. 15, 2026Exempt when imported for U.S. data centers, R&D, repairs and replacements and other listed uses; a broader phase two had not been announced as of November 2026
China Section 301 (since 2018)Chinese goods, including many computer parts and network productsMostly 25% or 7.5%Current; 178 exclusions extended to Jan. 9, 2027Check Chinese servers, motherboards and power supplies by code
China Section 301 (2024 increases)Chinese chips (HTS 8541, 8542) 50%; non-EV lithium-ion batteries 25%See leftChips since Jan. 1, 2025; batteries since Jan. 1, 2026Chinese batteries for UPS and storage cost more
Forced labor Section 30112.5% for China, Vietnam, Thailand and others; Taiwan topped up to 10% total, Korea and Japan to 12.5%; USMCA-qualifying goods from Mexico and Canada exemptSee leftSince July 24, 2026Section 232 goods and annex-listed goods excluded; check servers assembled in Taiwan or Southeast Asia against the annexes
Section 232 steel, aluminum and othersSteel and aluminum products and derivativesPer proclamationCurrentRacks and structural parts may be covered; check by code
IEEPA tariffs2025 fentanyl and reciprocal tariffsStruck downFeb. 20, 2026; CBP refunds through CAPE since Apr. 20, 2026Importers of record can claim refunds
$800 de minimisAll countriesSuspendedSince Aug. 29, 2025Spare parts and samples need formal entry

Things to handle together:

  • The 232 exemption depends on end use: the proclamation's exempt uses include U.S. data centers, repairs and replacements in the U.S., R&D and startups; Commerce and CBP decide whether end-use certifications are required. If GPUs or accelerator cards are later resold or exported, the use has changed; confirm with your customs broker.
  • Who is the importer of record: the importer is legally responsible for classification, value, origin and duty, and refunds go only to the importer. When an ODM delivers servers duty paid (DDP), the duty is in the price; when you import yourself, duty goes into equipment cost and is depreciated with it.
  • Origin: a server's origin depends on where it was "substantially transformed," and a chip's on where the wafer was fabricated. Building motherboards in China and doing simple assembly elsewhere may not change origin; your customs broker or an attorney makes that call.
  • Customs value and transfer pricing must match: when you buy equipment from a parent or related factory, the customs value is the intercompany price, and book cost generally can't exceed customs value plus related costs (IRC §1059A).
  • For more on chip and electronics tariffs, see the guide at yclcpa.com/semiconductor.
05

Export controls, CFIUS and data security: what do attorneys decide?

None of these is a tax question; attorneys decide them: export controls on advanced GPUs and related technology, CFIUS review of foreign investment in U.S. data centers, limits on giving countries of concern access to Americans' sensitive data, and power, environmental and land contracts. We make sure the structure, money flows and filings work on the tax side and give the attorneys the financial records they need.

  • Export controls (BIS): advanced computing chips and servers containing them are controlled under the Export Administration Regulations (EAR). Releasing controlled technology to a foreign person counts as an export, and a company with Chinese ownership buying or using advanced GPUs in the U.S., or selling compute to customers abroad, may need licenses. Since January 2026 some chip exports to China are reviewed case by case, and the Entity List "50% affiliates rule" is suspended until January 10, 2027.
  • CFIUS: a foreign investor acquiring a U.S. data center business, taking a board seat or gaining control may need to file. CFIUS rules list "any data center that is collocated at a submarine cable landing point" and internet exchange points that support public peering as critical infrastructure, and buying or leasing land near military installations needs its own review (see the guide at yclcpa.com/subsidiary).
  • Data security rule: the Justice Department's data security rule (28 CFR Part 202, effective April 8, 2025) restricts giving China and other countries of concern, and persons they control, access to bulk U.S. sensitive personal data and government-related data, including through data center hosting, cloud services, employment and investment. Foreign-owned cloud providers should have counsel assess compliance.
  • Federal permitting: Executive Order 14318 (July 23, 2025) calls for faster federal permitting of data centers and related power projects. Most approvals are still state and county matters: zoning, building permits, air permits for backup diesel generators, water use and stormwater.
  • What the books have to reflect: license conditions, customer restrictions and data compliance arrangements shape who you can sell to, where you collect revenue and where data and servers sit, and all of that shows up in income sourcing, transfer pricing and the returns. For AI software companies going global, see the guide at yclcpa.com/aigo.
06

Who regulates data centers, and how do North Carolina, California and New York compare?

There's no single federal data center license. Approvals are mostly state and county: zoning and building permits, generator air permits, water and grid interconnection. On the tax side, the three states differ on corporate income tax, conformity to federal bonus depreciation, sales tax on equipment and power, whether SaaS is taxable, and property tax.

Three states side by side

ItemNorth CarolinaCaliforniaNew York
Corporate income tax2% (2026, with further scheduled cuts)8.84%; $800 annual minimum6.5%; 7.25% if business income exceeds $5,000,000
Franchise / minimum taxFranchise tax $1.50 per $1,000 of net worth, $200 minimum$800 minimum for corporations and LLCsHighest of several bases; separate New York City corporate tax
Federal 100% bonus depreciationAdd back 85%, then deduct 20% a year over 5 yearsDoesn't conform; §179 limit $25,000Generally doesn't conform; state returns use regular depreciation
Data center equipment sales taxSupport equipment and software exempt for qualifying datacentersNo specific exemptionNo statewide specific exemption; negotiate with an IDA
Data center electricityTaxed at 7% from Aug. 6, 2026Not subject to sales taxCommercial use generally taxable
SaaS and remote softwareGenerally not taxedGenerally not taxedGenerally taxable (prewritten software)
Business personal property taxList with the county every JanuaryFile Form 571-L every yearNo tax on business personal property
WorkforceFederal minimum wage $7.25; E-Verify for 25+ employeesMinimum wage $16.90 (2026); AB5 ABC test; state disability insurance (SDI)Minimum wage $17 in NYC, Long Island and Westchester, $16 elsewhere (2026); wage notices, paid family leave and disability insurance
Local taxes and incentivesCounty property tax; counties often give cash grants tied to property taxesLocal business taxes, property taxNYC corporate tax; Commercial Rent Tax south of 96th Street in Manhattan on annual rent of $250,000 or more; MCTMT; IDA PILOTs
2026 policyElectricity exemption repealed, equipment exemption keptSeven data center bills, mostly effective Jan. 1, 2027State environmental permits paused for new 50 MW+ projects for up to a year

A few notes:

  • North Carolina: low corporate tax and the equipment exemption still in place, but the Department of Commerce must certify the datacenter first and the wage and health insurance conditions must keep being met. County incentives usually sit in an agreement with the county, refund part of the property tax actually paid, and shrink or are clawed back if investment and job targets are missed. State grants such as JDIG must be applied for before the project is announced.
  • California: expensive power and a tight grid make it a market for colocation and edge sites close to customers. The $800 minimum franchise tax applies once you're "doing business" in California, and because California doesn't allow bonus depreciation, servers are depreciated normally on the state return, so state and federal taxable income can differ widely.
  • New York: large projects face the permit pause and rate reform, while smaller colocation, enterprise and edge sites operate normally. Count New York City's Commercial Rent Tax and corporate taxes; SaaS is taxable in New York, so cloud providers selling to New York customers need to register.
  • Workforce: operations, security and electrical staff are usually W-2 employees; construction relies heavily on contractors, so collect W-9s, file 1099-NEC and, in California, apply AB5 first (see the guides at yclcpa.com/construction and yclcpa.com/1099nec).
07

Selling cloud services, SaaS and colocation: how does sales tax work?

It depends on the state and the substance of the contract. SaaS and remotely accessed software are generally not taxed in North Carolina or California but generally are in New York; Texas taxes data processing services on 80% of the price. A colocation contract that's mostly rack space and power usually isn't treated as a taxable sale in most states, but equipment rental, software and managed services bundled into it may be.

  • SaaS and cloud software: North Carolina generally doesn't tax remotely accessed software, California doesn't tax it, and New York treats the right to use prewritten software as taxable whether or not it's downloaded, at a combined 8.875% in New York City. For multistate customers, sourcing follows the customer's location (see the guides at yclcpa.com/aigo and yclcpa.com/stripetax).
  • IaaS, GPU compute and data processing: states treat "renting computing power" differently. Some treat it as a nontaxable service, some tax it as data processing or information services (Texas taxes data processing on 80% of the price), and some cities add their own tax, such as Chicago's personal property lease transaction tax on cloud computing. Check state by state and ask for a written ruling where needed.
  • Colocation: renting rack space, power and bandwidth alone is usually treated as a use of real property or a service; if the contract includes equipment rental, remote hands, software or network services, price them separately or the whole charge may be treated as taxable.
  • Economic nexus: most states require registration once sales into the state exceed $100,000 a year; California and Texas use $500,000, and New York uses $500,000 plus more than 100 transactions. Having servers, employees or an office in a state creates nexus on its own.
  • State income tax is separate: servers and employees in a state can mean income or franchise tax filings there, and states differ on whether receipts are sourced to the customer's location or to where costs are incurred. For North Carolina sales tax, see the guide at yclcpa.com/salestax.
08

Servers, buildings and power systems: how does depreciation work under the 2025 law?

Public Law 119-21, signed July 4, 2025, made 100% bonus depreciation permanent for property acquired after January 19, 2025. Servers, GPUs, storage and network gear are generally 5-year property and can be fully deducted in the year placed in service. Data center buildings are 39-year property and don't get the new 100% deduction for production buildings, and North Carolina, California and New York all require adjustments.

  • 5-year equipment: servers, storage, switches and similar information systems equipment are generally 5-year property eligible for 100% bonus depreciation; §179 is also available (2026 limit $2,560,000, phasing out above $4,090,000, mostly useful to smaller businesses). Bonus depreciation can create a loss, and carryforwards offset at most 80% of taxable income in a later year.
  • Buildings and building systems: data center buildings are nonresidential real property depreciated over 39 years. Whether UPS systems, generators, precision cooling, racks and cabling can be treated as equipment rather than building structure takes a cost segregation study, item by item. Interior improvements (not enlargements, elevators or the internal structural framework) may be 15-year qualified improvement property, which is also bonus-eligible.
  • What doesn't apply: the new law's 100% deduction for "qualified production property" (§168(n)) is limited to buildings used to manufacture or produce tangible products, which data centers generally aren't; and the 48D semiconductor credit is only for chip manufacturing facilities (see the guide at yclcpa.com/semiconductor).
  • On-site power and storage: self-owned storage, fuel cells and similar facilities may qualify for the 48E investment credit, with full credit for storage that begins construction by the end of 2033; prevailing wage and apprenticeship rules apply, and Chinese-owned companies also face the prohibited foreign entity (FEOC) rules (see the guide at yclcpa.com/solar).
  • Interest: for tax years beginning in 2025 and later, adjusted taxable income under §163(j) is again computed before depreciation and amortization, which gives leveraged data center builds more room to deduct interest.
  • State adjustments: North Carolina adds back 85% of federal bonus depreciation and deducts 20% of the add-back in each of the next five years; California doesn't allow bonus depreciation and caps §179 at $25,000; New York generally doesn't conform. With large server spend, keep federal, state and book depreciation schedules from year one.
09

Property tax and local incentives: do servers have to be listed every year?

Yes. Servers, network gear, generators and cooling equipment are business personal property. North Carolina requires a county listing every January, California requires Form 571-L every year, and New York doesn't tax business personal property. Large data center property tax bills are often partly refunded under incentive agreements with the county, but only if investment and job commitments are met.

  • North Carolina: business personal property owned on January 1 is listed during January, and the county values it using cost and depreciation schedules. County grants usually refund a percentage of the property tax actually paid. Richmond County, for example, approved cash grants for the AWS project for up to 20 years, based on up to 50% of real property tax and up to 65% of personal property tax, according to local reporting.
  • California: real property is taxed at about 1% of purchase price plus local add-ons; business personal property is reported annually on Form 571-L and depreciated under county tables.
  • New York: business personal property isn't taxed; real property can be covered by an IDA PILOT agreement, often negotiated together with sales tax exemptions on construction materials and equipment. The governor proposed ending data center tax breaks in 2026, so new projects should watch this closely.
  • Tax treatment of incentives: how county cash grants and property tax refunds are booked, and whether they're income, depends on §118 and the agreement terms. Review clawback terms with your attorney and with us before signing.
10

Foreign-owned operators: how should the company be set up, and how should money move with the parent?

Foreign-owned data center and cloud companies usually form a U.S. C corporation and register in the project's state, file BE-13 with BEA within 45 days of setting up or expanding, and file Form 5472 with Form 1120 every year. A foreign company operating a U.S. data center directly has effectively connected income and a 30% branch profits tax. Equipment, software licenses, operations services and loans between parent and subsidiary must all be priced at arm's length.

  • Entity: a C corporation pays a 21% federal rate and makes financing, treaty access and risk isolation easier. Whether to incorporate in Delaware or the project's state depends on investors, banks and incentive agreements (see the guides at yclcpa.com/llc and yclcpa.com/entity). A foreign company that holds U.S. servers and does business directly, without a subsidiary, files Form 1120-F and owes branch profits tax on earnings it repatriates.
  • BE-13 and Form 5472: a foreign person acquiring 10% or more of the voting interest in a U.S. business must file BE-13 within 45 days of a new setup, acquisition or expansion; if total cost is $40 million or less, file the exemption claim (see the guide at yclcpa.com/be13). A U.S. corporation that is 25% or more foreign-owned files one Form 5472 per foreign related party each year, with a $25,000 penalty per form per year for missing it (see the guide at yclcpa.com/5472).
  • Payments to the parent: dividends, interest and royalties paid to a foreign related party face 30% statutory withholding, reduced by treaty: generally 10% for China, where the treaty also treats payments for the use of industrial, commercial or scientific equipment as royalties; 0% for most interest and royalties to Japan; and 30% for Taiwan, which has no treaty in force. Collect Form W-8BEN-E and file Forms 1042 and 1042-S by March 15 (see the guide at yclcpa.com/w8ben).
  • Services performed abroad: when the parent's engineers operate or develop remotely from abroad, the service fee is generally foreign-source income with no withholding; work done in the U.S. is U.S.-source and has to be allocated by days.
  • Transfer pricing (IRC §482): whether the U.S. subsidiary is a full-fledged cloud provider or provides compute or hosting to the parent at cost plus determines where profit stays. The profile must match the contracts, the risks actually borne and the people; contemporaneous documentation can avoid the 20% or 40% adjustment penalties.
  • Real estate and FIRPTA: a foreign-owned company that owns data center land and buildings may become a U.S. real property holding corporation, so FIRPTA rules apply when shares or assets are later sold (see the guide at yclcpa.com/firpta).
  • The parent's side: Chinese companies need ODI filings for U.S. investment, Taiwanese companies apply to or report to the investment review authority, and Korean and Japanese companies report under their own foreign exchange rules. Local advisers handle these, and the U.S. numbers need to match them.
11

Example: a Japanese IT company leases space in a certified North Carolina datacenter and sells GPU compute

Example (hypothetical numbers, to show the method): J Co. is a Japanese IT company. In 2026 it forms a U.S. subsidiary (a Delaware C corporation) and leases about 2 MW of space in a qualifying datacenter in Wake County, North Carolina that the N.C. Department of Commerce has certified. From January 2027 it sells GPU cloud compute to U.S. business customers. Its GPU servers are assembled in Mexico; assume they qualify under USMCA and are imported for use in a U.S. data center, and that counsel has cleared export control and data compliance issues.

ItemAmountNotes
GPU servers, storage and network equipment$30,000,000Placed in service January 2027; 5-year property
Import duty$0Ordinary duty 0; Section 232 data center exemption; USMCA-qualifying, so no forced labor Section 301 tariff
Equipment sales tax if not exempt (Wake County 7.25%)$30,000,000 × 7.25% = $2,175,000Support equipment used in a certified datacenter is exempt; give the required exemption certificate and keep records
Annual electricity1.6 MW average × 8,760 hours = 14,016,000 kWh × $0.0845 ≈ $1,184,352Assumes North Carolina's average industrial price
Sales tax on electricity$1,184,352 × 7% ≈ $82,905 a yearTaxable for billing periods from Aug. 6, 2026; quarterly report within 30 days
Federal depreciation (2027)$30,000,000100% bonus depreciation; any loss carries forward
North Carolina add-back$30,000,000 × 85% = $25,500,000Deduct $5,100,000 a year in 2028–2032; North Carolina allows $4,500,000 in 2027
Software license fee to the Japanese parent$1,000,000 a yearGenerally 0% under the U.S.–Japan treaty (subject to limitation on benefits); still file 1042-S
BE-13Total cost about $30 million$40 million or less, so file the exemption claim within 45 days

What else the same company has to do:

  • Exemption status: certification belongs to the datacenter owner, but the tenant's equipment exemption depends on it. The lease should spell out the owner's duty to maintain certification and who pays if it lapses.
  • Power costs: if the owner passes electricity through to tenants, the sales tax still applies; the contract should say whether power charges include tax and who files the quarterly electricity report.
  • Property tax: list the servers with Wake County every January; if there's a county grant agreement, reconcile the refund to it.
  • Sales tax: compute sold to New York customers has to be tested under New York rules; North Carolina customers generally aren't taxed. Track economic nexus by state.
  • Year-end filings: Form 1120 with one Form 5472 per foreign related party; the bonus depreciation add-back on the North Carolina CD-405; Forms 1042 and 1042-S for the license fee; and arm's-length transfer pricing documentation.
12

From site selection to go-live: what order should you work in?

Settle the site, power and incentives first, then form the company and file BE-13, then apply for certification, sign power contracts, import equipment, hire and go live, and finish the federal, state and foreign-ownership filings together at year-end. Keep evidence of certification, investment progress and electricity reporting from day one.

Figure 3 Setting up a data center or cloud business in the U.S.: timeline and checklist

Description: What to do at each stage, the related tax filings and the steps that are easy to miss. Timing is typical; the project and the state's requirements govern.

StageWhat to doTax and filingsEasy to miss
Before choosing a siteCompare power prices, interconnection queues, zoning and water; negotiate incentives with the state and countyModel sales tax exemptions, electricity tax, property tax and depreciation; counsel reviews export controls, CFIUS and data complianceApplying for state grants after the project is announced
Forming the companyFormation, EIN, bank accounts; register in the project's stateBE-13 within 45 days; the parent's outbound investment filingsWiring funds before ODI or local foreign exchange filings are done
Certification and contractsApply for the state datacenter certification; sign power, lease and colocation contractsNorth Carolina determination by the Department of Commerce; split equipment, services and power in the contractsTenants not confirming the owner's certification status
Build-out and importsBuild or fit out; import servers and power equipmentDuty in cost; exemption certificates; evidence of investment progress over five yearsGPUs imported under the data center exemption later resold or exported
Go-live and salesHire operations staff; sell cloud services or colocationPayroll tax registration; state sales tax on SaaS and data processing; quarterly electricity reportsSales tax on SaaS sold to New York customers
Year-end and next yearClose the books, depreciation, transfer pricing reviewForms 1120 and 5472, state add-backs; 1042-S (March 15); business personal property listing (January in North Carolina)BEA's annual BE-15 survey letter
13

Tax and tariff points at a glance

ItemWho / authorityNumber / ruleNotesApplies
N.C. qualifying datacenterG.S. 105-164.3, 105-164.13(55a)$75 millionCumulative over 5 years; wage and health insurance conditions; support equipment and software exemptCurrent
N.C. datacenter electricitySession Laws 2026-41, 2026-427%Billing periods beginning on or after Aug. 6, 2026; separate report within 30 days after each quarterFrom 2026
Virginia equipment exemptionVa. Code §58.1-609.3(18)$150M / 50 jobs$70M / 10 jobs in distressed localities; 1.5x wage; through June 30, 2035Current
Virginia electricity tax2026 state budget$0.011/kWhCapped at $600 million a year statewideJuly 1, 2026 to June 30, 2028
Texas qualifying data centerTax Code §151.359$200M / 20 jobsState 6.25% exempt for 10 or 15 years; local tax appliesCurrent
California, New YorkState sales taxNo specific exemptionNo sales tax on electricity in California; IDA benefits in New YorkAs of Nov. 2026
New York permit pauseJuly 14, 2026 executive order50 MWState environmental permits for new projects paused up to one yearFrom 2026
100% bonus depreciation§168(k), P.L. 119-21100%Acquired after Jan. 19, 2025; servers generally 5-year; buildings 39-yearPermanent
§179Rev. Proc. 2025-32$2,560,000Phase-out begins at $4,090,0002026
State depreciation adjustmentsNC / CA / NY85% add-back / no / noN.C. deducts 20% a year over the next 5 years; California §179 $25,000Current
Section 232 semiconductorsCertain advanced computing chips25%Exempt for U.S. data centers, R&D, repairs and other listed usesSince Jan. 15, 2026
Forced labor Section 301China, Vietnam and others; Taiwan, Korea, Japan topped up12.5% / 10%USMCA-qualifying goods from Mexico and Canada and Section 232 goods excludedSince July 24, 2026
Form 5472 penalty25%+ foreign-owned U.S. corporations$25,000Per form per year; another $25,000 per 30 days if not filed within 90 days of IRS noticeCurrent
BE-1310%+ foreign-owned U.S. businesses45 daysExemption claim if total cost is $40 million or lessSince Oct. 3, 2025
Withholding: China / Japan / TaiwanRoyalties paid to a parent10% / 0% / 30%China treaty covers equipment rentals; no treaty in force with TaiwanCurrent treaties
14

Common mistakes

!

Mistake: assuming a North Carolina datacenter's power is still tax-free

For billing periods beginning on or after August 6, 2026, electricity used at a certified datacenter is taxed at 7%, and the buyer also files a quarterly report with the Department of Revenue. Anyone still relying on an old exemption certificate will owe the tax with penalties and interest. The equipment and software exemptions remain.

!

Mistake: thinking tenants don't need to care about certification

North Carolina's equipment exemption depends on the datacenter's certification and five-year investment progress as a whole; if the owner falls short and certification lapses, equipment the tenant bought may become taxable. Put the certification duty and the repayment responsibility in the lease.

!

Mistake: assuming state depreciation follows federal

North Carolina adds back 85% and deducts it over five years; California doesn't allow bonus depreciation and caps §179 at $25,000; New York generally doesn't conform. With large server purchases, state taxable income can be much higher than federal, so compute state estimated taxes on the state basis.

!

Mistake: assuming every imported GPU pays 25%, or that none do

The Section 232 tariff covers only certain advanced computing chips and derivative products, and imports for use in U.S. data centers are exempt, but resale or export changes the use. Chinese parts also carry Section 301 duties, and since July 2026 the forced labor tariff applies by country of origin. Check code by code and origin by origin.

15

Which issues matter most for which kind of company?

Start with whether you're an owner, a tenant or a service seller. These five situations are the most common.

  • Situation A: owners building or buying a data center. Focus on site selection and power contracts, state exemption certification and investment progress, property tax incentives and clawbacks, and cost segregation. Foreign acquirers should have counsel assess CFIUS first.
  • Situation B: tenants leasing space and installing servers in someone else's data center. Focus on the owner's certification status, equipment exemption certificates, power pass-throughs and the sales tax on electricity, server depreciation and personal property listings.
  • Situation C: companies selling SaaS, cloud services or GPU compute. Focus on state sales tax for SaaS and data processing, economic nexus and state apportionment; foreign-owned companies also need to look at export controls and data security rules (see the guide at yclcpa.com/aigo).
  • Situation D: companies supplying equipment, construction and maintenance to data centers. Focus on customers' exemption certificates, splitting equipment and installation contracts, tariffs and origin, and classifying contractors and employees (see the guide at yclcpa.com/construction).
  • Situation E: foreign parents setting up a U.S. cloud or colocation subsidiary. Focus on BE-13, Form 5472, the transfer pricing profile, withholding on payments to the parent and the parent's home-country outbound investment filings (see the guide at yclcpa.com/subsidiary).
Why YCL

Data center taxes, from site modeling to the annual filings

YCL works with technology companies investing and operating in the U.S., including data center, colocation and cloud companies and their equipment suppliers: modeling sales tax, electricity tax, property tax and depreciation before you choose a site, forming the company, bookkeeping, payroll, related-party transactions, tracking investment progress and filings for state exemptions, and the federal, state and foreign-ownership filings every year. Attorneys handle export controls, CFIUS, data compliance and power and land contracts; we work with them on the tax side so the numbers agree.

  • Big Four background, 15+ years in U.S. tax, 10 years of U.S.–China cross-border work, credentialed as CPA, EA and CAA
  • State exemption thresholds, electricity taxes, property tax incentives and federal and state depreciation modeled together before you pick a site
  • Server duty, equipment cost, depreciation schedules and personal property listings kept as one set of numbers, with Forms 5472, BE-13 and 1042-S done together
  • Multistate sales tax on SaaS and cloud services and North Carolina's quarterly electricity reports handled by the same team

How it works

  1. 1

    Free assessment

    A free 15-minute call about your model (owner, tenant or cloud seller), owners, customers and site plans, and a list of what to look at.

  2. 2

    Modeling and recommendations

    State exemptions, electricity tax, property tax, depreciation and the transfer pricing profile, with written analysis and recommendations.

  3. 3

    Setup and ongoing work

    Formation, EIN, BE-13, bookkeeping, payroll and withholding, with servers and power costs booked monthly and exemption certification and investment progress filed by project.

  4. 4

    Annual filings

    Forms 1120 and 5472, state returns and depreciation adjustments, sales tax and electricity reports, personal property listings and 1042-S; if the IRS or a state writes, the same team answers.

16

FAQ

Are North Carolina data centers still exempt from sales tax?

Equipment yes, electricity no. A qualifying datacenter certified by the N.C. Department of Commerce ($75 million or more invested over five years, plus wage and health insurance conditions) still buys servers, cooling, power equipment and software free of sales tax. But the electricity exemption was repealed: billing periods beginning on or after August 6, 2026 are taxed at 7%, and buyers report to the N.C. Department of Revenue within 30 days after each quarter.

Can data center servers be written off in the first year?

Federally, yes. Servers, GPUs, storage and network equipment acquired after January 19, 2025 are generally 5-year property and can be fully deducted with 100% bonus depreciation in the year placed in service. State returns need adjustments: North Carolina adds back 85% and deducts 20% a year over the next five years, California doesn't allow bonus depreciation, and New York generally doesn't conform. Data center buildings are depreciated over 39 years.

Do imported GPU servers pay the Section 232 tariff?

As of November 2026, Section 232 imposes 25% on certain advanced computing chips and derivative products, but imports for use in U.S. data centers, R&D, repairs and replacements and other listed uses are exempt. Origin matters too: Chinese servers follow the China Section 301 lists, and since July 24, 2026 the forced labor tariff adds 10% or 12.5% by country, with USMCA-qualifying goods from Mexico exempt. Confirm with your customs broker and the latest CBP guidance.

Are SaaS and cloud services subject to sales tax?

It depends on the state. SaaS and remotely accessed software are generally not taxed in North Carolina or California but generally are in New York, at a combined 8.875% in New York City, and Texas taxes data processing on 80% of the price. A colocation contract that's mostly space and power usually isn't taxed in most states, but bundled equipment rental and software may be. Most states require registration after $100,000 of sales a year.

Can YCL handle the tax side of a U.S. data center or cloud business?

Yes, on the tax side from start to finish. YCL CPA (yclcpa.com) models sales tax exemptions, electricity tax, property tax and depreciation before you choose a site, handles formation, BE-13, bookkeeping, payroll and withholding, and files Forms 1120 and 5472, state returns, sales tax and electricity reports and 1042-S every year. Attorneys handle export controls, CFIUS, data compliance and power contracts, and we work with them on the numbers. Results depend on your facts and each agency's review. Book a free 15-minute call to start.

Sources

  • N.C. Gen. Stat. §105-164.3 (definitions of datacenter, qualifying datacenter and eligible internet datacenter) and §105-164.13(43a), (55) and (55a); N.C. Department of Revenue: Important Notice: Repeal of Exemptions for Electricity Used at Datacenters (July 23, 2026); EY Tax News 2026-1662 (July 31, 2026); N.C. Department of Revenue: corporate income tax rates
  • Office of the N.C. Governor: Amazon $10 billion investment in Richmond County (June 4, 2025)
  • Va. Code §58.1-609.3(18); Hunton Andrews Kurth: Virginia Adds Electricity Consumption Tax but Stops Short of Repealing Data Center Sales Tax Exemption (July 16, 2026); Virginia SCC final order in Dominion's biennial review (November 25, 2025, GS-5 class)
  • Texas Comptroller: Data Centers sales tax exemption guidance; Texas SB 6 (2025)
  • Office of the California Governor: data center bill signing release (September 22, 2026); Foley & Lardner: California Enacts Seven Data Center Bills (September 2026); SB 57 (Chapter 647, Statutes of 2025)
  • Office of the New York Governor: Governor Hochul Launches First Statewide Moratorium (July 14, 2026); Bloomberg Law (July 14, 2026)
  • DOE / LBNL: 2024 United States Data Center Energy Usage Report (December 20, 2024); EIA: Electric Power Monthly Table 5.6.A (released November 24, 2026, September 2026 data); Census Bureau construction spending; KPMG: August 2026 Construction Spending (October 1, 2026)
  • Section 232 semiconductors proclamation (Proclamation 11002, signed January 14, 2026, Federal Register 2026-01052); USTR: forced labor Section 301 actions (Federal Register 2026-15181, July 28, 2026); Holland & Knight: New Section 301 Forced-Labor Tariffs Imposed on 60 Countries (July 2026); USTR: 2024 four-year review modifications (Federal Register 2024-21217); U.S. Supreme Court: Learning Resources, Inc. v. Trump (February 20, 2026)
  • 31 CFR Part 800, Appendix A (CFIUS critical infrastructure); 28 CFR Part 202 (DOJ data security rule); Executive Order 14318 (July 23, 2025); BIS: extension of the Affiliates Rule suspension to January 10, 2027
  • IRC §§168(k), 168(n), 179, 163(j), 482, 1059A and 897; Public Law 119-21; Rev. Proc. 2025-32; N.C. Department of Revenue: Adjustment for Bonus Depreciation; Instructions for Form 5472; BEA: BE-13 ($40 million threshold since October 3, 2025); U.S.–China and U.S.–Japan income tax treaties

Planning a data center or cloud business in the U.S.?

Book a free 15-minute call. A CPA will walk through your site state's exemptions and electricity tax, server tariffs and depreciation, SaaS sales tax and the foreign-ownership filings with you, with no fee and no sales pitch.

Book a callQuick quote